Works For Main Road By Way Of , Awantipora - Tender Details
Explore tender information for Works For Main Road By Way Of in Awantipora, including eligibility, deadlines, and bid specifics.
Islamic University of Science and Technology
Awantipora, Jammu and Kashmir, India
NTID 39282587
Opening Date : Tue 4th March, 2025
Closing Date : Mon 3rd March, 2025
- ₹ 10228651.00
- NTID 39282587
Works For Main Road By Way Of Construction Of Footpaths And Other Allied Works From Main Gate To Round Off Up To Administration Block At Iust Campus I Awantipora.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
204573.00 -
Document Cost
5000.00 -
Estimated Cost
10228651.00
BOQ Items Total Items : 27 | Total Qty : 9826.11
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil | 247.830 | Cum |
2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 168.750 | Cum |
3 | Providing and laying Stone soling hand packed incl ramming, watering etc complete job | 481.080 | Cum |
4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 185.540 | Cum |
5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 866.660 | Sqm |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054