Description

Work Contract For Erection Of Ht Lt Lines And Distribution Transformer Structure With Dts Etc Of D.p.palayam 11kv Feeder At 33 11 Kv Paradarami Ss Under Agri Feeder Seregation Of Rdss Scheme In Paradarami Operation And Maintenance Section In Gudiyattham Division

Tendering Authority: TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED

India, Tamil Nadu, Tirupathur

NTID

29044301

Last Date For Submission

10 Oct, 2022

Closing Date

10 Oct, 2022

BOQ Items
# Item Quantity Units
1 Excavation of Pole Pits/Stay Set:
2 For pole upto 8.0m length by using JCB/Manual 43 Per Pit
3 For pole above 8.0m length by using JCB/Manual 230 Per Pit
4 In Hard Soil (common to all size of poles) 34 Per Pit
5 In rocky area(common to all size of poles) by blasting/Manual 40 Per Pit
6 Excavation of Stay pit of 4.5' to 5' depth using JCB/Manual 262 Per Pit
7 Erection of Poles and Accessories
8 Erection of RCC, REC, PSC poles upto 8.00m length by using JCB/Manual 43 Per Pole
9 Erection of RCC, REC, PSC poles above 8.00m length by using JCB/Manual 263 Per Pole
10 Erection of metal supports above 9m/RSJ/Rail pole/Tubular pole 41 Per Pole
11 Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding etc. 262 Each set
12 Fixing of line materials
13 Fixing of HT V Cross arms 3 1/2, 4 1/2 & 5 feet, Tapping cross arm & Guarding cross arm 411 Per Loc
14 Fixing of LT 3 Phase cross arm 188 Per
15 Fixing of LT single Phase cross arm 14 Each
16 Fixing of HT / LT TI Fitting 288 Each
17 Fixing of HT Pin Insulators (11/22/33KV) 1037 Each
18 Fixing of LT Pin Insulators 102 Each
19 Fixing of HT 11KV stain disc 417 Each
20 Fixing of Two Tapping cross arm per cut point upto 33KV line including fixing of Discs, insulators and Jumpering etc 2 Per loc
21 Set right of all siizes of leaning poles 10 Per pole
22 Fixing of LT Shackle 422 Each
23 Fixing of Aluminium knob 136 Each
24 Paving and Stringing of conductor
25 Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor 11.248 Per KM (Route Length)
26 Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR 12.678 Per KM (Route Length)
27 Paving and stringing of conductors of sizes 7/4.09 mm ACSR or other equivalent conductor 31.528 Per KM (Route Length)
28 Releasing and reerection (resagging) of one run of all sizes of conductor 2 Per KM (Route Length)
29 Erection of Distribution Transformers:
30 Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa.upto 25 KVA 1 Each
31 Erection of Distribution transformer including loading of distribution transformer at stores and erection at structure or vice versa above 25KVA to 100KVA DT. 2 Each
32 Erection of 11KV Single pole structure including erection of DT complete without centre support 39 Per Structure
33 ERECTION OF DP STRUCTURE:
34 Erection of single pole DP with complete and with single earth 5 Per Structure
35 Concreting Works
36 Concreting with 1:4:8 mix using 40mm jelly including curing (material +labour) mass concreting of poles 304 Per Pole
37 stay concreting 262 Per Location
38 Earthing
39 Earthing of poles with GI wires 4 or 6 SWG by coil earthing 304 Each
40 Loading/Unloading Charges
41 Loading of DT upto 100KVA 39 Each
42 Unloading of DT upto 100KVA 39 Each
43 Loading of various size of REC, RCC,PSC Poles upto 8.0m length 43 Per Pole
44 Loading of various size of REC, RCC,PSC Poles above 8.0m length 307 Per Pole
45 Loading of metal Poles of all sizes 41 Each
46 Unloading of various size of REC, RCC,PSC Poles upto 8.0m length 43 Per Pole
47 Unloading of various size of REC, RCC,PSC Poles above 8.0m length 307 Per Pole
48 Unloading of metal Poles of all sizes 41 Each
49 Loading of conductor 14 Per Drum
50 Unloading of conductor 14 Per Drum
51 Loading of line material 16 Per Tonne
52 Unloading of line material 16 Per Tonne
53 Loading of 11 KV strain disc 35 Per Crate
54 Unloading of 11 KV strain disc 35 Per Crate
55 Loading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc., 18 Per 100
56 Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc., 18 Per 100
57 Transportation charges
58 Transportation of all types and sizes of poles and other associated material from road side to pole pit and vice versa upto 0.50KM 391 Per Pole
59 Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) upto 5 KM 391 Per Pole
60 Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM 391 Per Pole
61 Transporting of conductors of all size from road side to pit locations upto 1 KM of conductor 55.454 Per KM (Distance)
62 Transporting of Distribution Transformer / Line materials from stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry) 20 Upto One Ton
63 Dismantling of Line Materials
64 Dismandling of RCC, REC, PSC & Metal poles of all sizes including the closing of pit 40 Per Pole
65 Dismantling of conductor of upto 7/3.35 including Transporting the conductor to the nearest road side and stocking in coils 1.3 Per KM
66 PAINTING:
67 Numbering of poles including base painting and with cost of paint 352 Per Pole
68 Painting of iron poles up to 40 ft 200/100 length with double coats including cost of paint 41 Each
69 Painting of Cement poles by Distember coating including cost of distember 306 Per Pole
70 WORKSHOP CHARGES :-
71 Manufacturing/ Altering of clamps 350 Each
72 Drilling of holes in the structure materials clamps etc. 1000 Per hole
73 AB switch or open type side arm stud, cutting and drilling holes. 44 Per set
74 Manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe 88 Per str.
75 GENERAL
76 Jungle clearance such as Kattu Karuvai in the various area without uprooting 1250 SQ.mtr
77 Jungle clearance such as Kattu Karuvai in the various area with uprooting 1250 SQ.mtr
78 Clearing of Tree brances of coconut tree 300 Per tree
79 Clearing of Tree brances of Neem, Tamerined, country etc 300 Per tree
80 Leveling of Ground using Bul Dozer 25 Per Hour
81 Cleaaring of Branches/ Trees with JCB 25 Per Hour
82 Fencing of Distribution Transformer Structure at road side- Fabrication and Erection. (Including all materials) 39 Set
83 E.P.F. @13 % should be Entered by the Bidder 1 Percentage
84 E.S.I. @3.25 % should be Entered by the Bidder 1 Percentage
85 G.S.T. @18% should be Entered by the Bidder 1 Percentage