ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
12- Vikas Khand Achhnera Ke Gr, Agra - Tender Details
Explore tender information for 12- Vikas Khand Achhnera Ke Gr in Agra, including eligibility, deadlines, and bid specifics.
Director Cum Chief Engineer RED
Agra, Uttar Pradesh, India
NTID 39346559
Opening Date : Mon 24th February, 2025
Closing Date : Mon 24th February, 2025
- ₹ 0.00
- NTID 39346559
12- Vikas Khand Achhnera Ke Gram Rasool Pur Me Shamshan Ghat Shed Ki Boundarywall Nirman Karya
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
47000.00 -
Document Cost
854.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 15 | Total Qty : 3551.07
# | Item | Quantity | Units |
---|---|---|---|
1 | Excavation in foundation in ordinary soil (Loam, Clay or Sand ) including lift upto 1.50 m and lead upto 30 m and including filling watering and ramming of excavated earth into trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer In-Charge upto distance of 30m from the foundation trenches. as per SI No.251 | 59.40 | Cum |
2 | Providing and laying Cement Concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) and curring complete, including cost of form work. in foundation and floors. As per CH - 5 SI No. 4.1.8 | 14.84 | Cum |
3 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcment 1:1.5:3 (1 Cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). as per CH - 5 SI no. 5.2.2 | 10.99 | Cum |
4 | Class-150 (Non Modular) brick work in 1:6 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. as per CH - 6 S I No.6.1.2 | 88.43 | Cum |
5 | Class-150 (Non Modular) brick work in 1:6 Cement and Coarse sand mortar in super structere above plinth up to floor five level including necessary cutting and moulding of brick work as required and also including honeycombed brick work in thickness of wall more then 12cm. and including supply of all materials, labour and T&P etc. required for proper completion of the work.as per CH - 6 S I No. 6.1.2+6.8A | 79.69 | Cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054