Description
Various Repair Work Toilet And Bathroom For Prisoners At Central Jail Alwar.
BOQ Items Total Items : 34 | Total Qty : 3330
# | Item | Quantity | Units |
---|---|---|---|
1 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meter lead. | 400 | Sqm. |
2 | Providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, levelling course etc up to floor five level excluding the cost of centering and shuttering M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 9 | Cum |
3 | Dismantling tile work in floors and roofs laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meter lead :For thickness of tiles 10mm to 25mm | 200 | Sqm. |
4 | Labour Charges for removing WVC pan:Indian/Orissa pan | 17 | Each |
5 | Demolishing cement concrete including disposal of material within 50 meters lead : 1 : 3 : 6 or richer mix | 12 | Cum |
