Facebook
Description

110v Dc Ups For Numaligarh Refinery Expansion Project

Tendering Authority: Numaligarh Refinery Limited

India, Assam, Numaligarh

NTID

30010775

Last Date For Submission

16 Dec, 2022

Closing Date

16 Dec, 2022

BOQ Items Total Items : 49 | Total Qty : 113
# Item Quantity Units
1 DC UPS SYSTEM (SMPS), 110V, Parallel Redundant type 110V DC SMPS system consisting of 2 x 100% float cum boost charger in parallel redundant configuration, including Condition monitoring as detailed in the specification TP-1ZZZA-EL-SPE-0017 and Cell booster as per SLD & duty cycle as per requisition documents and shall include testing after erection, precommissioning and commissioning. 1 EA
2 DC UPS SYSTEM (SMPS), 110V, Single non-redundant type 110V DC SMPS system consisting of 1 x 100% float cum boost charger in single non-redundant configuration, including Condition monitoring as detailed in the specification TP-1ZZZA-EL-SPE-0017 and Cell booster as per SLD & duty cycle as per requisition documents and shall include testing after erection, precommissioning and commissioning. 1 EA
3 DC UPS SYSTEM (SMPS), 110V, Parallel Redundant type 110V DC SMPS system consisting of 2 x 100% float cum boost charger in parallel redundant configuration, including Condition monitoring as detailed in the specification TP-1ZZZA-EL-SPE-0017 and Cell booster as per SLD & duty cycle as per requisition documents and shall include testing after erection, precommissioning and commissioning. 1 EA
4 DC UPS SYSTEM (SMPS), 110V, Single non-redundant type 110V DC SMPS system consisting of 1 x 100% float cum boost charger in single non-redundant configuration, including Condition monitoring as detailed in the specification TP-1ZZZA-EL-SPE-0017 and Cell booster as per SLD & duty cycle as per requisition documents and shall include testing after erection, precommissioning and commissioning. 1 EA
5 DC UPS SYSTEM (SMPS), 110V, Parallel Redundant type 110V DC SMPS system consisting of 2 x 100% float cum boost charger in parallel redundant configuration, including Condition monitoring as detailed in the specification TP-1ZZZA-EL-SPE-0017 and Cell booster as per SLD & duty cycle as per requisition documents and shall include testing after erection, precommissioning and commissioning. 1 EA
Tender InquiryInquiry