Tender for Public Works Department - NTID 29344976
Public Works Department
Sumbal, Jammu and Kashmir, India
NTID 29344976
- Opening Date : Fri 7th October, 2022
- Closing Date : Thu 6th October, 2022
- ₹ 1369000.00
- NTID 29344976
Upgradation Of Link Road From Pahlipora Masjid To Bone Mohalla At Hakbara.
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
27380.00 -
Document Cost
600.00 -
Estimated Cost
1369000.00
BOQ Items Total Items : 5 | Total Qty : 3834.5
# | Item | Quantity | Units |
---|---|---|---|
1 | Supply ,Stacking, Sorting, Laying, Watering, Spreading to template and consolidation by power road roller of 8 to 10 tone capacity WBM Grade 3rd with quarry stone aggs 53-22.4mm size including stone screening 11.2mm size and binding material/Moorum to specified lines, grades and cross sections including carriage of materials from source to site of work .loading, unloading complete job. | 90.00 | Cum |
2 | Providing and applying tack coat using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On W.B.M. @ 0.75 Kg/sqm. Including carriage. | 1228.00 | Sqm |
3 | Providing and laying bituminuous macadam using crusher stone aggrigate of specified grading premixed with bituminous binder, transported to site by tippers layed over a previously prepared surface with paver finish equipped with electronic sensor to the requird grade, lavel and allignment and rolling with smooth weeled, vibratory and tendom rollers as per specification to achieve the desired compaction and density, complete as per specification and directions of engineer incharge, 50 to 100 mm average compacted thickness with bitumin upgrade VG-10 @ 3.5%( percentage by weight of total mix) prepared in Drum Type hot mix plant of 60-90 TPH capacity incld. all carriages Complete. | 60.50 | Cum |
4 | Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge incl. carriages Complete. 25mm compacted thickness with bitumen of grade VG 10 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. | 1228.00 | Sqm |
5 | Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road incl. all carriage all complete. | 1228.00 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane