Up Gradation Of Government Polytechnic Institute And Iti In Assam In Centre Of Excellence (construction Of Workshop And Tech-lab At 61 Nos. Of Iti / Polytechnics Of Assam) At Govt. Industrial Training Institute, Hailakandi And Hailakandi Polytechnic

Tendering Authority: Public Works Building and NH Department

India, Assam, Hailakandi

NTID

29182297

Last Date For Submission

10 Oct, 2022

Closing Date

10 Oct, 2022

BOQ Items Total Items : 116 | Total Qty : 105769.50999999998
# Item Quantity Units
1 Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer -in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing and direction of Engineer -in - charge. 2260.000 M3
2 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out All kinds of soil. 361.880 m3
3 Brick on edge flooring with bricks of class designation 7.5 on a bed of 12 mm cement mortar, including filling the joints with same mortar, with common burnt clay non modular bricks: 1:4 (1 cement : 4 coarse sand) 1989.700 m2
4 Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Along the external wall below concrete or masonry apron using chemical emulsion @ 2.25 litres per linear metre includ- ing drilling and plugging holes etc.: With Chlorpyriphos/ Lindane E.C. 20% with 1% concentration 327.040 Rm
5 Treatment of soil under existing floors using chemical emul- sion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration 1989.700 m2