Inquiry NowTowards Pointing To The Expose, Vadnagar - Tender Details
Explore tender information for Towards Pointing To The Expose in Vadnagar, including eligibility, deadlines, and bid specifics.
Archaeological Survey of India
Vadnagar, Gujarat, India
NTID 38890651
- Opening Date : Thu 16th January, 2025
- Closing Date : Wed 15th January, 2025
- ₹ 1741728.00
- NTID 38890651
Towards Pointing To The Exposed Fort Wall, Bastions And Excavated Trenches ,removal Of Loose Materials From Joints, Cleaning , Construction Of Missing/ Fallen Courses Of Walls, Laying Of Lime Concrete,etc.as Mentioned Boq
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
43543.00 -
Document Cost
Refer Documents -
Estimated Cost
1741728.00
BOQ Items Total Items : 5 | Total Qty : 913.6
# | Item | Quantity | Units |
---|---|---|---|
1 | Execution of work under following items | ||
2 | Towards pointing to the exposed fort wall, bastions and excavated trenches after careful raking out the joints, removal of loose materials from the joints, cleaning and preparation of the surface by using appropriate tools with mud mortar (3:1) (3 part mud (potter's clay) : 1 part fine sand) mixed with additives like natural jute fiber, bhusa, gobar (dung) etc. in the proportion as workable at site including all materials and labors charges, for erecting and removal of scaffolding as and when required etc. all complete as directed by site in-charge.. | 827 | Sq.mt |
3 | Towards Construction of missing / fallen courses of masonry walls using old bricks (including cost of collected bricks from the old houses) including charges for materials and for loading, unloading and transportation at site charges) in mud mortar 1:3:1 (1 part lime : 3 part mud : 1 part coarse sand) and pointing the joints with same mortar mixed with additives, including labor charges for erecting and removal of scaffolding as and when, wherever required as directed by site in-charge. | 51.64 | Cu.mt. |
4 | Towards Laying of lime concrete over the top of the exposed fort wall to prevent the water penetration by using lime concrete with graded brick aggregate 20-40 mm nominal size and 50% mortar comprising of 1 lime putty : 1 Sand : 1 Surkhi, rammed and finishing the surface matched with the mud mortar (3:1) (3 part mud (potter's clay) : 1 part coarse sand) mixed with additives like natural jute fiber, bhusa, gobar (dung) etc including all cost of materials and labours charges. complete as directed by site in-charge. | 31.96 | Cu.mt. |
5 | Towards Engaging skilled supervisory staff to look after the on-going conservation and for monitoring of the works as directed by site in-charge. (Having experience of similar kind of work) | 3 | EACH |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054