Facebook
Description

Tender For Supply Of Geotechnical Investigation By Boring Of Boreholes All Kinds Of Soil On River Water Bodies Bank, Geotechnical Investigation By Boring Of Boreholes All Kinds Of Soil In River Water Bodies Bed, Drilling Through Rock Boulder Strata On River Water Bodies Bank, Drilling Through Rock Boulder Strata In River Water Bodies Bed, Field Investigations Conducting Standard Penetration Tests In Boreholes As Specified As Decided By Eic, Field Investigations Collecting 100 Mm Dia Undisturbed Sample Form Boreholes As Specified As Decided By Eic, Field Investigations Collecting Disturbed Samples From Bore Holes, Conducting The Following Laboratory Tests Atterbergs Limit (liquid Limit & Plastic Limit), Conducting The Following Laboratory Tests Natural Moisture Content, Conducting The Following Laboratory Tests Bulk And Dry Density, Conducting The Following Laboratory Tests Specific Gravity And Void Ratio, Conducting The Following Laboratory Tests Ground Water Level, Conducting The Following Laboratory Tests Grain Size Analysis And Is Classification, Conducting The Following Laboratory Tests Shear Strength Parameters (cohesion And Friction Angle), Conducting The Following Laboratory Tests Chemical Analysis Of Soil, Laboratory Test On Rock Sample Core Recovery (rqd), Laboratory Test On Rock Sample Mohrs Scale Of Hardness, Laboratory Test On Rock Sample Point Load Test, Laboratory Test On Rock Sample Unconfined Compressive Strength, Hydrographical Topographical And Hydrological Survey Kosi River (bank To Bank Width 600 M Approx), Geotechnical Investigation By Boring Of Boreholes All Kinds Of Soil On River Water Bodies Bank, Geotechnical Investigation By Boring Of Boreholes All Kinds Of Soil In River Water Bodies Bed, Drilling Through Rock Boulder Strata On River Water Bodies Bank, Drilling Through Rock Boulder Strata In River Water Bodies Bed, Field Investigations Conducting Standard Penetration Tests In Boreholes As Specified As Decided By Eic, Field Investigations Collecting 100 Mm Dia Undisturbed Sample Form Boreholes As Specified As Decided By Eic, Field Investigations Collecting Disturbed Samples From Bore Holes, Conducting The Following Laboratory Tests Atterbergs Limit (liquid Limit & Plastic Limit), Conducting The Following Laboratory Tests Natural Moisture Content, Conducting The Following Laboratory Tests Bulk And Dry Density, Conducting The Following Laboratory Tests Specific Gravity And Void Ratio, Conducting The Following Laboratory Tests Ground Water Level, Conducting The Following Laboratory Tests Grain Size Analysis And Is Classification, Conducting The Following Laboratory Tests Shear Strength Parameters (cohesion And Friction Angle), Conducting The Following Laboratory Tests Chemical Analysis Of Soil, Laboratory Test On Rock Sample Core Recovery (rqd), Laboratory Test On Rock Sample Mohrs Scale Of Hardness, Laboratory Test On Rock Sample Point Load Test, Laboratory Test On Rock Sample Unconfined Compressive Strength, Hydrographical Topographical And Hydrological Survey Ram Ganga River Nala (bank To Bank Width 60 M Approx)

Tendering Authority: GAIL(INDIA)LIMITED

India, Uttar Pradesh, Ghaziabad

NTID

28723275

Last Date For Submission

27 Aug, 2022

Closing Date

27 Aug, 2022

Download Documents
NTID: 28723275
Sub Contract Service
Tender InquiryInquiry