Tender for Bharat Petroresources Limited - NTID 30524491
Bharat Petroresources Limited
Ahmedabad, Gujarat, India
NTID 30524491
- Opening Date : Tue 30th November, -0001
- Closing Date : Thu 4th May, 2023
- ₹ 0.00
- NTID 30524491
Tender For Long Lead Items- Well Construction- All Tangibles Required To Construct The Well As Per Sow (surface And Subsurface/wellbore) Inclusive But Not Limited To Oil Country Tubular Goods (octg) And Related Accesories, X-mastrees, Well Heads, Hangers And Related Accessories, Spares Etc. (also Refer Clause 17.5 Of Scc), Consumables- All Consumables Required To Drill The Well As Per Sow (surface And Subsurface/wellbore) Inclusive But Not Limited To Drill Bits, Mud Chemicals, Brine, Cement & Chemcials, Fuel, Spares Etc., Operating Day Rate (odr) Shall Include All Associated Drilling Services To Execute Sow (cost For Services Required For Drilling Including, But Not Limited To Directional Drilling, Casing Services, Mud Logging, Mud Services, Cementing Services, Wireline Logging Services, Drilling And Fishing Tools, Wellhead Services, Casing And Tubing, Liner Running Services, And Services With Associated Services And Project Mangement, Including Manpower Etc. As Required To Drill The Well. Contractor Shall Provide All The Services Required To Conduct Drilling Operation With Rig. This Rate Shall Exclude Rig Day Rate And Cost Of Supply Of Tangibles To Be Installed In The Well (octg, Float Equipment, Centraliser And Wellhead & X-mas Tree And Consumables Required For Successful Completion Of The Well Construction In Accordance Of Sow. , Operating Day Rate (odr) For Drilling Rig Only. Contractor Shall Mobilize Suitable Drilling Rig (at Least 1000 Hp) For Drilling Operations Including Running Of Casing, Tubing And Carrying Out Fishing Operations Etc. Contractor Shall Provide All The Services Required To Conduct Drilling Operation With Rig As Mentioned In Scope Of Work (sow), Lumpsum Cost For Mobilization And Demobilization Of Integrated Drilling Services & Rig As Defined In The Sow, Inter-location Movement Of Rig And All Other Equipmets And Chemicals (less Than 20 Km Distance), Operating Day Rate (odr) For Integrated Testing Services (its) - It Shall Include All Testing Services With Workover Rig, Including, But Not Limited To Services Required For Drill Stem Test (dst) Including Tangibles To Be Installed In The Well - X-mas Tree And Consumables Required For Successful Completion Of The Well Testing Operation In Accordance Of Sow. Contractor Shall Provide All The Services Required To Conduct Oil Well Testing Operation With Workover Rig. , Lumpsum Cost For Mobilization And Demobilization Of All The Its Services And Materials (workover Rig And All The Services Related To Testing) As Mentioned In Sow., Inter-location Movement Of Workover Rig And All Other Testing Equipmets And Chemicals (less Than 20km Distance), Waste Management Services As Mentioned In Sow., Pre-hydrated Bentonite Wbm Up To 9.0 Ppg ( Only In Case Of Mud Losses More Than 200 Bbl), Kcl-phpa-polyol-polyamine Based Wbm Up To 11.0 Ppg ( Only In Case Of Mud Losses More Than 200 Bbl), Kcl-phpa-polyol-polyamine Based Wbm - 11.0 - 12.0 Ppg ( Only In Case Of Mud Losses More Than 200 Bbl), Kcl-phpa-polyol-polyamine Based Wbm - 12.1 - 13.0 Ppg ( Only In Case Of Mud Losses More Than 200 Bbl), Cement Slurry Cost - 12.8 Ppg Lead 13 3/8in Casing , Cement Slurry Cost - 15.8 Ppg Tail 13 3/8in Casing , Cement Slurry Cost - 12.8 Ppg Lead 9 5/8in Casing , Cement Slurry Cost - 15.8 Ppg Tail 9 5/8in Casing , Cement Slurry Cost - 15.8 Ppg Lead 5 1/2in Casing , Cement Plug Slurry - 15.8 Ppg , Formation Mdt- Multi-sampler (3 Pvt), Sample Chamber (1g), Fluid Analyzer, Pump And Single Probe, Formation Mdt- Multi-sampler (3 Pvt), Sample Chamber (1g), Fluid Analyzer, Pump And Single Probe, Dual Packer Module With Packer Elements For 12 Inch And 8 Inch Holes., Dual Packer Module With Packer Elements For 12 Inch And 8 Inch Holes., Nuclear Magentic Resonance Logging Tool, Nuclear Magentic Resonance Logging Tool, Resistivity Imager, Resistivity Imager, Dipole Sonic Imager, Dipole Sonic Imager, Free Point Indicator And Backoff Services, Free Point Indicator And Backoff Services, Tubing, Drill Pipe And Drill Collar Severing And Colliding Tools, Tubing, Drill Pipe And Drill Collar Severing And Colliding Tools, Tubing Cutter Services And Drill Pipe Cutting Services, Tubing Cutter Services And Drill Pipe Cutting Services, Drill Pipe And Tubing Puncture Services, Drill Pipe And Tubing Puncture Services, Wireline Casing Gun Perforation, Wireline Casing Gun Perforation, Setting Tool- Bridge Plug, Setting Tool- Bridge Plug, Setting Tool- Retainer Packer, Setting Tool- Retainer Packer, Setting Tool- Junk Basket, Setting Tool- Junk Basket
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
Refer Documents -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane