Facebook
Description

Supply of FIXING ARRANGEMENT OF ROLLING SHUTTER ASSEMBLY FOR 3-PHASE MEMU/DMC COACHES, as per Drawing: DMU/TC/V/SS-2-5-002 ALT cR1 COL-II, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQUATE STRENGTH. TRANSIT DAMAGE , IF ANY , SHALL BE AT THE COST OF SUPPLIER.

Tendering Authority: Rail Coach Factory

India, Punjab, Multi city

NTID

25125795

Last Date For Submission

27 Jul, 2021

Closing Date

27 Jul, 2021

Tender InquiryInquiry