Tender for Frakka Barrage Project - River Development and Ganga Rejuvenation - NTID 31288574
Frakka Barrage Project - River Development and Ganga Rejuvenation
Murshidabad, West Bengal, India
NTID 31288574
- Opening Date : Fri 24th March, 2023
- Closing Date : Wed 22nd March, 2023
- ₹ 473822.00
- NTID 31288574
Supply, Installation, Commissioning Of Radar Type Digital Or Automatic Water Level Recorder Including Minimum 1 Year Warranty On Products And 3 Years Overall Annual Maintenance Contract.
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
9500.00 -
Document Cost
Refer Documents -
Estimated Cost
473822.00
BOQ Items Total Items : 14 | Total Qty : 34.1881
# | Item | Quantity | Units |
---|---|---|---|
1 | Supply of GSM based water level monitoring instrument using Radar technology. | 2.000 | Each |
2 | Software dashboard and data hosting for (1+2) years. | 2.000 | Each |
3 | Installation & Commissioning of instrument. | 2.000 | Each |
4 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-in-charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structural members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. 1) For structural members of specified sections weighing less than 22.5 Kg./m | 0.158 | MT |
5 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL | 0.0161 | MT |
Purchase Access To Download Selected Documents
₹ 200