Tender for Punjab Cricket Association - NTID 30564955
Punjab Cricket Association
Mohali, Punjab, India
NTID 30564955
- Opening Date : Wed 8th February, 2023
- Closing Date : Tue 7th February, 2023
- ₹ 0.00
- NTID 30564955
Supply And Commissioning Of 21 Lifts Including Related Civil And Electrical Works Along With Camc For 5 Years At International Cricket Stadium At Mullanpur (new Chandigarh)
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
400000.00 -
Document Cost
11800.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 15 | Total Qty : 2102.54
# | Item | Quantity | Units |
---|---|---|---|
1 | Design, Supply, installation, testing and commissioning of 22 passengers (1492 Kg) Gearless lifts with machine less room to serve G+3 upper floors with AC variable voltage & variable frequency (VVVF) Gearless drive, PMSM Motor Belt/ rope, complete with all standard accessories, full collective simplex controlled operation, centre opening power doors with door drive (Electric motor driven mechanism) sliding stainless steel doors, Automatic Rescue device system and built in intercom system without hand set & infra red curtain along with related civil and electrical works, all as specified herein under:- Note: 1. The Lifts shall be installed by the original eqpt manufacturer only.2. The Lifts shall be tested by IEM at the time of installation in the attendance of manufacturer.3.The contractor will carry out telephone wiring from all the lifts to the control room as suggested by the Engr-in-charge and installed telephone with any additional exchange/communication equipment if required. This control room should be able to communicate with all the lifts through telephone 24 hrs uninterrupted necessary UPS (Exide, Amaron make) etc will be provided by the contractor without any additional cost to the department along with BMS Compatibility and preferably NXL facility i.e. when door do not open fully at a destination floor, the doors close and the car automatically moves to the next or nearest floor where the doors will open. The complete lifts including testing, Commissioning and safety provisions shall be confirming to relevant IS codes. | 2.000 | Each |
2 | Design, Supply, installation, testing and commissioning of 19 passengers (1292 KG) Gearless lifts with machine less room to serve G+3 upper floors with AC variable voltage & variable frequency (VVVF) Gearless drive, PMSM Motor Belt/ rope, complete with all standard accessories, full collective simplex controlled operation, centre opening power doors with door drive (Electric motor driven mechanism) sliding stainless steel doors, Automatic Rescue device system and built in intercom system without hand set & infra red curtain along with related civil and electrical works, all as specified herein under:- Note: 1. The Lifts shall be installed by the original eqpt manufacturer only.2. The Lifts shall be tested by IEM at the time of installation in the attendance of manufacturer.3.The contractor will carry out telephone wiring from all the lifts to the control room as suggested by the Engr-in-charge and installed telephone with any additional exchange/communication equipment if required. This control room should be able to communicate with all the lifts through telephone 24 hrs uninterrupted necessary UPS (Exide, Amaron make)etc will be provided by the contractor without any additional cost to the department along with BMS Compatibility and preferably NXL facility i.e. when door do not open fully at a destination floor, the doors close and the car automatically moves to the next or nearest floor where the doors will open. The complete lifts including testing, commissioning and safety provisions shall be confirming to relevant IS codes. | 3.000 | Each |
3 | Design, Supply, installation, testing and commissioning of 17 passengers (1156 KG) Gearless lifts with machine less room to serve G+3 upper floors with AC variable voltage & variable frequency (VVVF) Gearless drive, PMSM Motor Belt/ rope, complete with all standard accessories, full collective simplex controlled operation, centre opening power doors with door drive (Electric motor driven mechanism) sliding stainless steel doors, Automatic Rescue device system and built in intercom system without hand set & infra red curtain along with related civil and electrical works, all as specified herein under:- Note: 1. The Lifts shall be installed by the original eqpt manufacturer only.2. The Lifts shall be tested by IEM at the time of installation in the attendance of manufacturer.3.The contractor will carry out telephone wiring from all the lifts to the control room as suggested by the Engr-in-charge and installed telephone with any additional exchange/communication equipment if required. This control room should be able to communicate with all the lifts through telephone 24 hrs uninterrupted necessary UPS (Exide, Amaron make)etc will be provided by the contractor without any additional cost to the department along with BMS Compatibility and preferably NXL facility i.e. when door do not open fully at a destination floor, the doors close and the car automatically moves to the next or nearest floor where the doors will open. The complete lifts including testing, commissioning and safety provisions shall be confirming to relevant IS codes. | 2.000 | Each |
4 | Design, Supply, installation, testing and commissioning of 19 passengers (1292 KG) Gearless lifts with machine less room to serve G+2 upper floors with AC variable voltage & variable frequency (VVVF) Gearless drive, PMSM Motor Belt/ rope, complete with all standard accessories, full collective simplex controlled operation, centre opening power doors with door drive (Electric motor driven mechanism) sliding stainless steel doors, Automatic Rescue device system and built in intercom system without hand set & infra red curtain along with related civil and electrical works, all as specified herein under:- Note: 1. The Lifts shall be installed by the original eqpt manufacturer only.2. The Lifts shall be tested by IEM at the time of installation in the attendance of manufacturer.3.The contractor will carry out telephone wiring from all the lifts to the control room as suggested by the Engr-in-charge and installed telephone with any additional exchange/communication equipment if required. This control room should be able to communicate with all the lifts through telephone 24 hrs uninterrupted necessary UPS (Exide, Amaron make)etc will be provided by the contractor without any additional cost to the department along with BMS Compatibility and preferably NXL facility i.e. when door do not open fully at a destination floor, the doors close and the car automatically moves to the next or nearest floor where the doors will open. The complete lifts including testing, commissioning and safety provisions shall be confirming to relevant IS codes. | 3.000 | Each |
5 | Design, Supply, installation, testing and commissioning of 17 passengers Gearless lifts with machine less room to serve G+2 upper floors with AC variable voltage & variable frequency (VVVF) Gearless drive, PMSM Motor Belt/ rope, complete with all standard accessories, full collective simplex controlled operation, centre opening power doors with door drive (Electric motor driven mechanism) sliding stainless steel doors, Automatic Rescue device system and built in intercom system without hand set & infra red curtain along with related civil and electrical works, all as specified herein under:- Note: 1. The Lifts shall be installed by the original eqpt manufacturer only.2. The Lifts shall be tested by IEM at the time of installation in the attendance of manufacturer.3.The contractor will carry out telephone wiring from all the lifts to the control room as suggested by the Engr-in-charge and installed telephone with any additional exchange/communication equipment if required. This control room should be able to communicate with all the lifts through telephone 24 hrs uninterrupted necessary UPS (Exide, Amaron make)etc will be provided by the contractor without any additional cost to the department along with BMS Compatibility and preferably NXL facility i.e. when door do not open fully at a destination floor, the doors close and the car automatically moves to the next or nearest floor where the doors will open. The complete lifts including testing, commissioning and safety provisions shall be confirming to relevant IS codes. | 4.000 | Each |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane