ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowStrengthening Of Bt Road At Pa, Tiruvallur - Tender Details
Explore tender information for Strengthening Of Bt Road At Pa in Tiruvallur, including eligibility, deadlines, and bid specifics.
Rural Development And Panchayat Raj Department
Tiruvallur, Tamil Nadu, India
NTID 39051489
- Opening Date : Wed 5th February, 2025
- Closing Date : Wed 5th February, 2025
- ₹ 6500000.00
- NTID 39051489
Strengthening Of Bt Road At Panapakkam Mettu Colony In Panapakkam Panchayat At Minjur Block Pac.01
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
65000.00 -
Document Cost
Refer Documents -
Estimated Cost
6500000.00
BOQ Items Total Items : 48 | Total Qty : 10178.43
# | Item | Quantity | Units |
---|---|---|---|
1 | Strengthening of BT road at Panapakkam Mettu Colony in Panapakkam panchayat km 0/0-1/000 R-195 VPR | ||
2 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1073.74 | m2 |
3 | Picking BT Surface Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 | 994.20 | m2 |
4 | Gravel Shoulders Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 119.30 | cum |
5 | Formation of Earthern Shoulders Earthwork excavation inn all classess of soils except hard rock deploying machineries including cost and conveyance of all materials to site anf labour charges , including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 351.03 | m3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054