Strengthening And Black Toping, Tirunelveli - Tender Details
Rural Development And Panchayat Raj Department
Tirunelveli, Tamil Nadu, India
NTID 39824869
- Opening Date : Mon 31st March, 2025
- Closing Date : Mon 31st March, 2025
- ₹ 1200000.00
- NTID 39824869
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
12000.00 -
Document Cost
Refer Documents -
Estimated Cost
1200000.00
BOQ Items Total Items : 11 | Total Qty : 4056.11
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2). | 113.04 | sqm |
2 | Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete as per standard specifications. | 525.67 | sqm |
3 | Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete. | 28.26 | cum |
4 | Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete. | ||
5 | Km 0/0-1/0 | 34.02 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054