ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowSpecial Repair To Road From Rp, Rajouri - Tender Details
Explore tender information for Special Repair To Road From Rp in Rajouri, including eligibility, deadlines, and bid specifics.
Military Engineer Services
Rajouri, Jammu and Kashmir, India
NTID 38861062
- Opening Date : Tue 28th January, 2025
- Closing Date : Tue 21st January, 2025
- ₹ 820000.00
- NTID 38861062
Special Repair To Road From Rp Gate To Office Complex At Field Regiment At Poonch Under Ge 881 Ews
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 9 | Total Qty : 518.55
# | Item | Quantity | Units |
---|---|---|---|
1 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces, depth exceeding 50mm deep and not exc 100 mm deep and area not exceeding 400sqm, stacking the serviceable material at site and removing the surplus material to a distance not exceeding 50m complete all as specified and directed. | 31.00 | 10 Sqm |
2 | Repair to pot holes any depth not exc. 1 Sqm each including sweeping free from dust and mud or water, scoring sunken surfaces in roads, path etc. cutting around edges to at least 25 mm in depth, making good by filling in screened & graded road metal watering & well ramming, complete all as specified and directed. Notes : (i) Loose material and standing water shall be brushed from the area to be repaired. (ii) Potholes shall be cut to vertical sides and deepened to reach sound material . (iii) Fill the patch with the granular mix in layers of about 75mm at a time. Each layer shall be compacted with hand rammers or with small vibratory compactors. The patch shall be compacted to the correct shape. (iv)100% quantity of Pot holes shall be marked and checked by Engineer-in-charge before commencement of work and shall also be entered in MB with reference to permanent objects before starting carpeting work | 1.00 | 10 Sqm |
3 | M & L for providing premix bituminous macadam ( VG-30) (consolidated thickness 75mm or less) with 4% binder content of paving bitumen (VG-30) by weight of total mix, rolled and compacted to required camber and gradient with 8 to 10 tonne power roller, complete all as specified and directed. Note:- Bituminous macadam shall be mixed in hot mix plant, transported and shall be laid in single layer with self propelled mechanical paver, rolled with vibrator roller. Notes : (i) The job mix formula shall be approved by GE. (ii) 4.0% binder content has been specified for quoting purpose of bid. If the quantity of the bitumen exceeds the 4.0% as mentioned above, no plus price adjustment shall be made. If the quantity of bitumen required as per job mix formula works out less than 4.0%, the recovery of the supply only bitumen shall be effected @ Rs. 50/- per Kg. The cost of transportation of material and testing charges shall be borne by the contractor. | 15.50 | Cum |
4 | M & L for preparing black top surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surfaces with power sweeper or compressor to remove all loose dirt etc and Applying evenly a priming/ tack coat with bituminous primer using paving bitumen at 5 kg per 10 sq metre of road surface complete all as specified and directed. complete all as specified and directed. | 160.00 | X Sqm |
5 | M & L for bituminous premix semi dense asphaltic concrete 30mm consolidated thickness with 5.5% bitumen binder (VG-30) content by weight of total mix using 20mm crushed stone aggregate, rolled and compacted to required camber and gradient with 8 to 10 tonne vibrator power roller, complete all as specified and directed. Notes : (i) Bituminous premix semi dense asphaltic concrete shall be mixed in automatic temperature controlled hot mixing plant, transported and premix carpet shall be laid in single layer with self propelled mechanical paver, rolled with vibrator roller complete all as specified and directed. (ii) The job mix formula shall be approved by GE. (iii) 5.5% binder content has been specified for quoting purpose of bid. If the quantity of the bitumen exceeds the 5.5% as mentioned above, no plus price adjustment shall be made. If the quantity of bitumen required as per job mix formula works out less than 5.5%, the recovery of the supply only bitumen shall be effected @ Rs. 50/- per Kg. The cost of transportation of material and testing charges shall be borne by the contractor. | 129.00 | 10 Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054