- Home
- >
- Tender
- >
- Himachal Pradesh Tender
- >
- Department of Directorate of Tourism
- >
NTID 39739190
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Special Repair Of Tourist Info, Shimla - Tender Details
Directorate of Tourism
Shimla, Himachal Pradesh, India
NTID 39739190
- Opening Date : Thu 3rd April, 2025
- Closing Date : Thu 3rd April, 2025
- ₹ 4553866.00
- NTID 39739190
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
91000.00 -
Document Cost
2000.00 -
Estimated Cost
4553866.00
BOQ Items Total Items : 132 | Total Qty : 15418
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing of jungle i/c uprooting of rank vegetation, grass brush wood, trees and sapling of girth upto 30 cm measured at a height of 1 meter above ground and removal of rubbish complete including carriage of material in all lead and lift as per the direction of Engineer-in-charge. | 250.00 | Per Square Metre |
2 | Providing and laying in position cement concrete 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) of specified grade excluding the cost of centering and shuttering including carriage of materials up to all lead and lift as per direction of Engineer -incharge.- All work up to plinth level. | 4.00 | Per Cubic Metre |
3 | Providing and laying cement concrete 1:2:4(1 cement:2 sand :4 graded stone aggregate 40mm nominal size)and curing complete including carriage of material in all lead and lift as per the direction of Engineer-in-charge.excluding cost of form work in: Foundation and plinth. | 5.00 | Per Cubic Metre |
4 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 g/cum. Excess/ less cement used as per design mix is payable/recoverable separately) including carriage of materials up to all lead and lift as per direction of Engineer -incharge. | ||
5 | All works above plinth level upto all floor height. | 20.00 | Per Cubic Metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054