Sopan Enclave Priyadarshini Yo, Lucknow - Tender Details
Explore tender information for Sopan Enclave Priyadarshini Yo in Lucknow, including eligibility, deadlines, and bid specifics.
LUCKNOW DEVELOPMENT AUTHORITY
Lucknow, Uttar Pradesh, India
NTID 39413432
Opening Date : Sat 1st March, 2025
Closing Date : Fri 28th February, 2025
- ₹ 4874000.00
- NTID 39413432
Sopan Enclave Priyadarshini Yojna Me Roof Top Ongrid 95 Kilowatt Chamta Ka Solar Power Plant Ki Aapurti And Sthapana Ka Karya
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
243700.00 -
Document Cost
2950.00 -
Estimated Cost
4874000.00
BOQ Items Total Items : 28 | Total Qty : 383
# | Item | Quantity | Units |
---|---|---|---|
1 | Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono bifacial / Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/ GI structure of suitable strength with following components complete as required BIS approved (DSR-2022 (E/M) | 95 | Kw |
2 | a) Solar Photovoltaic Module of capacity 330 -550 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730- Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. | ||
3 | b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. | ||
4 | c) Data Monitoring System complete with accessories. | ||
5 | d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054