Description
Sanehua Se Charaya Hote Huye Rampur Dudaura Tak Link Road Par Puliya Ka Reconstruction Work
Tendering Authority: Public Works Department
India, Uttar Pradesh, Ghazipur
NTID
30502977
Last Date For Submission
28 Jan, 2023
Closing Date
28 Jan, 2023
BOQ Items Total Items : 22 | Total Qty : 4032.56
# | Item | Quantity | Units |
---|---|---|---|
1 | Excavation in foundation in soil mixed with moorum/ shingle/black cotton/ kankar requiring the use of special T&P such as pickaxe, subbals etc. including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the Engineer in charge up to a distance of 30m. from the foundation trenches including all T&P phowarah and basket etc. complete. As per S.I 252 (Including cost of all materials, T&P, labour cess etc but Excluding G.S.T.) | 530.00 | Cum. |
2 | Sand filling in Foundation including supply of necessary quantity of sand from a distance not exceeding 8km from the site of work and including watering dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of the work. As per S.I.255. (Including cost of all materials, T&P, labour cess etc but Excluding G.S.T.) | 23.00 | Cum. |
3 | Concrete with 4cm gauge stone ballast,approved coarse sand and cement in proportion of 8:4:1 including supply of all materials labour T&P etc complete. As per S.I.281. (Including cost of all materials, T&P, labour cess etc but Excluding G.S.T.) | 38.00 | Cum. |
4 | M-150 Brick Work in 1:3 cement & coarse sand including supply of all material T&P etc complete. As per S.I.No.307. (Including cost of all materials, T&P, labour cess etc but Excluding G.S.T.) | 102.00 | Cum. |
5 | Mild steel or iron in plain work such as in reinforced concreted or reinforced brick work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage. Bend hooks and authorized overlapping shall be measured. (Including cost of all materials, T&P, labour cess etc but Excluding G.S.T.) | 125.00 | Qtl |
