ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRoutine Maintenance Of Breakwa, NANCOWRIE - Tender Details
Explore tender information for Routine Maintenance Of Breakwa in NANCOWRIE, including eligibility, deadlines, and bid specifics.
ANDAMAN LAKSHADWEEP HARBOUR WORKS
NANCOWRIE, Andaman and Nicobar Islands, India
NTID 38909734
- Opening Date : Wed 22nd January, 2025
- Closing Date : Tue 21st January, 2025
- ₹ 1680090.00
- NTID 38909734
Routine Maintenance Of Breakwater And Other Allied Structure At Breakwater Complex At Campbell Bay For A Period Of One Year 2025-26
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
33602.00 -
Document Cost
Refer Documents -
Estimated Cost
1680090.00
BOQ Items Total Items : 7 | Total Qty : 208857.5
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing the area of bushes by cutting around Breakwater area as and when required by the EIC., including disposing off the debris/garbage with in a lead of 50mts including cost of all labour charges, GST, Labour welfare cess, minor tools etc., complete. | 43900.00 | Sqm |
2 | Sweeping and cleaning over trestle approach and break water approach and surrounding area including conveying sweepage by head load of 100 to 150mtr. And dumping the same, including cost of labour charges, cost of broom, all other minor tools, GST & labour cess etc., complete | 163800.00 | Sqm |
3 | Dismantling the damaged concrete portion of richer mix including removing/ disposal of the dismantled materials, chipping and clearing the surface to surface to receive to receive the new concrete including cost of all minor tools and labour cess, GST etc., complete. | 5.00 | Cum |
4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering, finishing and reinforcement but including cost of all labour charges, transportation charges, GST, Labour welfare cess and minor tools etc., complete. 1:11/2:3 (1cement, 1% River sand mainland, 3 graded stone aggregate 20mm nominal size from mainland quarry) | 5.00 | Cum |
5 | Providing and fixing Tor steel reinforcement for concrete work including cost of tor steel of grade FE500, cutting, bending, binding, binding wire, minor tools all labour charges, GST & labour cess etc complete . | 2.50 | Qtl |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054