Rlbcd-62 2024-25 Construction, Kamakhyanagar - Tender Details
Explore tender information for Rlbcd-62 2024-25 Construction in Kamakhyanagar, including eligibility, deadlines, and bid specifics.
MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION
Kamakhyanagar, Odisha, India
NTID 39435874
Opening Date : Mon 3rd March, 2025
Closing Date : Sun 2nd March, 2025
- ₹ 599790.00
- NTID 39435874
Rlbcd-62/ 2024-25 Construction Trough Wall From Rd 0.00m To Rd 40.00m Of Lmc Of Ramial Irrigation Project.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 6 | Total Qty : 562.66
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation in foundation in all kinds of soil hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge. | 149.420 | Cum |
2 | Filling in foundation and plinth with sand well watered and rammed including cost, carriage and royality of sand etc complete as directed by the Engineer-in-charge. | 24.610 | Cum |
3 | R.C.C./CC work of M-15 grade with 20mm and Down grade black hard granite (crusher broken) Stone chips including hoisting and laying including all cost conveyance of materials etc, complete as directed by the Engineer-in-charge. | 66.560 | Cum |
4 | Providing formwork for concrete with F1 finish for upstream faces of dam, spillway, glacis of barrages, unexposed surfaces of foundation, block joints etc.with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour, materials and T & P complete as directed by the Engineer-in-charge. | 276.810 | Sqm |
5 | Filing bitumen and cement jute fibre in expansion joints inclusinve of cost of material bitumen and cement proportion (3:1) including cleaning before pouring 12mm to 25 mm and 15mm depthcomplete as directed by the Engineer-in-charge. | 13.860 | Rmt. |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054