Tender for PUBLIC HEALTH ENGINEERING DEPARTMENT - NTID 27980844
PUBLIC HEALTH ENGINEERING DEPARTMENT
Reasi, Jammu and Kashmir, India
NTID 27980844
- Opening Date : Fri 11th November, 2022
- Closing Date : Thu 10th November, 2022
- ₹ 15590000.00
- NTID 27980844
Retrofitting And Augmentation Of Wss Akhli Buttan
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
Refer Documents -
Document Cost
Refer Documents -
Estimated Cost
15590000.00
BOQ Items Total Items : 85 | Total Qty : 113707.73
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in bulk excavation by manual means over areas (Exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. On plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be leveled and neatly dressed in all kinds of soil | 939.080 | Cum |
2 | Earth work in bulk excavation by Mechanical means (Hydraulic excavator) over areas (Exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. On plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be leveled and neatly dressed in all kinds of soils. | 1607.540 | Cum |
3 | Extra rates for quantaties of earth works executed in or under water and/or liquid mud, including pumping out water as required, shall be @ 20% of the rate of the item . The unit namely ,meter depth to be considered for payment shall be the depth measured from the sub soil water level uptothe center of gravity of the quantity executed in these difficult conditions. The depth shall be reckoned correct to 0.1 meter, 0.05 meteror more shallbe taken as 0.1meter and less than 0.05 meter ignored.The extra percentage rate is applicable in respect of each item but limited to quantaties of work executed in these difficult conditions . 1st lift of 1 mtr below sub soil water level upto the centre of gravity of the Qty executed under sub soil water conditions per mtr depth @ 20% of the rate of item per metre depth. | 37.750 | Cum |
4 | 2nd lift of 1 mtr below sub soil water level upto the centre of gravity of the Qty executed under sub soil water conditions.per mtr depth @ 20% of the rate of item per metre depth | 75.500 | Cum |
5 | 3rd lift of 1 mtr below sub soil water level upto the centre of gravity of the Qty executed under sub soil water conditions per mtr depth @ 20% of the rate of item per metre depth | 113.250 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane