ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Restoration Of Agriculture Lan, Mendhar - Tender Details
Explore tender information for Restoration Of Agriculture Lan in Mendhar, including eligibility, deadlines, and bid specifics.
Rural Development and Panchayati Raj
Mendhar, Jammu and Kashmir, India
NTID 39307736
Opening Date : Wed 19th February, 2025
Closing Date : Tue 18th February, 2025
- ₹ 1000000.00
- NTID 39307736
Restoration Of Agriculture Land By Way Of P/work And Bunding In The Sliding Area Nr. Imran Khalil And Others Pyt. Kalaban Faizabad Block Mendhar Under Ut Capex Budget Tsp 2024-25
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
20000.00 -
Document Cost
600.00 -
Estimated Cost
1000000.00
BOQ Items Total Items : 8 | Total Qty : 679.02
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil : | 69.96 | cum |
2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size | 4.77 | cum |
3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 30 % stone | 117.90 | cum |
4 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 78.92 | cum |
5 | Centering and shuttering including strutting, propping etc. and removal of form for: 5.9.1 Foundations, footings, bases of columns etc. for mass concrete. | 186.97 | sqm |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054