Inquiry NowReplacement Of Old Existing Er, Rishikesh - Tender Details
Explore tender information for Replacement Of Old Existing Er in Rishikesh, including eligibility, deadlines, and bid specifics.
THDC India Limited
Rishikesh, Uttarakhand, India
NTID 38930918
- Opening Date : Tue 28th January, 2025
- Closing Date : Mon 27th January, 2025
- ₹ 1783800.00
- NTID 38930918
Replacement Of Old Existing Eroded Ms Pipeline (nb 250 Mm And Nb 200mm) Of Clear Water System From El-622(near Link Shaft) To El-605 (ventilation Tunnel) Via El 600mm. (station Control Area) With New Ss Pipeline
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
35676.00 -
Document Cost
Refer Documents -
Estimated Cost
1783800.00
BOQ Items Total Items : 4 | Total Qty : 452
# | Item | Quantity | Units |
---|---|---|---|
1 | Dismanteling of existing vertically laid old MS NB250mm pipeline of Clear Water Supply from Link Shaft Area (EL-622) to EL-605 (Ventilation tunnel) via El.600in.(Station control area) through constraint verticle covered shaft of Tehri HPP including making arrangement/platform / structure for dismantling of pipeline with aII structural material, consumable materials, T&P and Labour charges complete in all respects. | 34 | Meter |
2 | Installation and laying of vertical pipeline of NB250mm SS 304 Seamless Pipe with ASTM standard A312 (SCH 10) with flanges/bends/nuts & Bolts complete with joints, fittings & supports from Link Shaft Area (EL-622) to EL-605 (Ventilation tunnel) via El.600m.(Station control area) through constraint verticle covered shaft of Tehri HPP by cutting, making V- grooves then joining by gas welding through suitable filler material, ultrasonic testing of welded joints and thereafter testing & charging of line including waking arrangement/ plateform / structure for installation of pipe line with all structural material, T&P, Consumable materials and Labour charges complete in all respects. | 34 | Meter |
3 | Dismanteling of existing horizontal laid old MS NB250mm pipeline of Clear Water Supply from Link Shaft Area (EL-622) to EL-605 (Ventilation tunnel) via El.600m. (Station control area) of Tehri HPP including making arrangement/platform / structure for dismantling of pipeline with all structural material, consumable materials, T&P and Labour charges complete in all respects. | 192 | Meter |
4 | Installation and laying of horizontal pipeline of NB250mm SS 304 Seamless Pipe with ASTM standard A3I2 (SCH 10) with flanges/bends/elbows complete with joints, fittings & supports in overhead area from Link Shaft Area (EL-622)to EL-605 (Ventilation tunnel) via Et.600m. (Station control area) of Tehri HPP by cutting, making V-grooves then joining by gas welding through suitable filler material, ultrasonic testing of welded joints and thereafter testing & charging of line including making arrangement/plateform/ structure for installation of pipe line with all structural material, T&P, Consumable materials and Labour charges complete in all respects. | 192 | Meter |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054