ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRepairing Work For Public Toil, Chakan - Tender Details
Explore tender information for Repairing Work For Public Toil in Chakan, including eligibility, deadlines, and bid specifics.
DEPARTMENT OF MUNICIPAL ADMINISTRATION
Chakan, Maharashtra, India
NTID 38888719
- Opening Date : Mon 20th January, 2025
- Closing Date : Fri 17th January, 2025
- ₹ 7500000.00
- NTID 38888719
Repairing Work For Public Toilet And Buildings In The City For The Financial Year 2025-26 For Chakan Municipal Council
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
75000.00 -
Document Cost
5000.00 -
Estimated Cost
7500000.00
BOQ Items Total Items : 96 | Total Qty : 96
# | Item | Quantity | Units |
---|---|---|---|
1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.5 m.) by Mechanical Means. | 1.000 | Cubic Metre |
2 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.50 m) by Mechanical Means.. | 1.000 | Cubic Metre |
3 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting, dewatering etc. complete (lift upto 1.5 m) by Mechanical Means. | 1.000 | Cubic Metre |
4 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift upto 1.5 m) by Mechanical Means. | 1.000 | Cubic Metre |
5 | Disposing of Excavated Material including loading, unloading & stacking for 3 K.M. lead etc. comlete | 1.000 | Cubic Metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054