ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRepairing Renovation Of 314 No, Nagaon - Tender Details
Explore tender information for Repairing Renovation Of 314 No in Nagaon, including eligibility, deadlines, and bid specifics.
NATIONAL HEALTH MISSION
Nagaon, Assam, India
NTID 38929196
- Opening Date : Thu 30th January, 2025
- Closing Date : Wed 29th January, 2025
- ₹ 2726763.00
- NTID 38929196
Repairing Renovation Of 314 Nos. Sub Centres To Upgrade Them As Ayushman Arogya Mandir At Various Places Of Assam, Group 14, 4 Nos. Of Scheme In Nagaon District.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
54535.00 -
Document Cost
1000.00 -
Estimated Cost
2726763.00
BOQ Items Total Items : 68 | Total Qty : 6907.62
# | Item | Quantity | Units |
---|---|---|---|
1 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below | 20.00 | each |
2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 31.05 | M3 |
3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size | 0.72 | M |
4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size de rived from natural sources) | 18.24 | M |
5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 110.26 | M |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054