- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of Central Coalfields Limited (CCL)
- >
NTID 39790491
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Repairing Of Coal Receiving Pl, Bokaro - Tender Details
- Opening Date : Tue 1st April, 2025
- Closing Date : Mon 31st March, 2025
- ₹ 0.00
- NTID 39790491
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
3800.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 9 | Total Qty : 7065
# | Item | Quantity | Units |
---|---|---|---|
1 | Infrastructure making for repairing of coal receiving hopper. a) M.S channel (100x50) mm cutting work.16 x06 Nos b) M.S plate (3.16mm) cutting work for above.(40 +60 ) x 02 side c) Welding work for above work(96 +80 +96 ) | 1 | Inch |
2 | Cutting of R.S joist (200x100) mm and M.S channel (100x50) mm changing of structure of above coal receiving hopper. a) Old & damaged structure member cutting work. 24 x08 Nos 36 x02 side x 08 Nos b)New steel materials cutting work. 32 x04 Nos (R.s joist outing) 36 x04 Nos . (T. making) c) Above steel materials fixing and fitting with proper levelling then Multilayer welding work. (i) 32 x08 x Nos x 03 layer (ii) 36 x08 x Nos x 02 side 03 layer (d) M.s channel(100x50) mm cutting for inserting as strengthening Purpose (i) 16 x08 Nos (e) Welding work for above channel (100x50) mm. (i) 16 x08 Nos 03 layer (ii) 36 x02 side x 08 Nos x 02 layer | 1 | Job |
3 | M.S plate (16mm) cutting work for coal receiving mother plate (i) (105 +76 ) x 02 side x 03 Nos. (ii) (99 +35 ) x 02 side. | 1354 | Inch |
4 | Damaged & tear-bear mother plate of coal receiving hopper work. (i) (36 +24 ) x 02 side x 02 times x 02 Nos. (ii) (28 +24 ) x 02 side 02 times x 03 Nos. | 1104 | Inch |
5 | All scrap materials removing from working site , coal dust, cleaning new steel materials shifting at working site placing by chain block fitting and fitting with the help of L & V wedges by hamming method with proper levelling etc. (i) 02 fitter x 02 shift x 03 days (ii)10 helper x 02 shift 03 days | 1 | Job |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054