Description
Repair Work In Administrative Block (quarter Guard) At Rpl Pali
BOQ Items Total Items : 49 | Total Qty : 11107.689999999999
# | Item | Quantity | Units |
---|---|---|---|
1 | Dismantling roofs with care including stacking of serviceable material and disposal of unserviceable material with in 50 Mtr. lead for : Lime terrace. | 703.53 | Sqm |
2 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster incl. disposal of rubbish to the dumping ground within 50mtr lead | 1421.56 | Sqm |
3 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finished: | 1421.56 | Sqm |
4 | Grading roof water proofing treatment with : Cement concrete 1:2:4 (1-Cement:2-coarse sand :4-graded stone aggregate 20mm nominal size). | 45 | Cum |
5 | Providing batta (gola) 75mm x 75mm in cement concrete (1:2:4) including finished with cement mortar 1:3 as per standard design. | 305.41 | Mtr |