ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRepair Replacement And Mainte, Kolkata - Tender Details
Explore tender information for Repair Replacement And Mainte in Kolkata, including eligibility, deadlines, and bid specifics.
hooghly River Bridge Commissioners
Kolkata, West Bengal, India
NTID 38897907
- Opening Date : Mon 27th January, 2025
- Closing Date : Fri 24th January, 2025
- ₹ 1721114.00
- NTID 38897907
Repair, Replacement And Maintenance Of Gap Slab Of Up Carriageway Of Joint No Kv4, Kv5, Kv8 And Kv9 Of Kolkata Viaduct Of Vidyasagar Setu
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
34500.00 -
Document Cost
1000.00 -
Estimated Cost
1721114.00
BOQ Items Total Items : 17 | Total Qty : 194594.4
# | Item | Quantity | Units |
---|---|---|---|
1 | Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed. | 76.80 | Sqm |
2 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. III) For built up sections / srtuctural members of specified sections weighing not less than 22.5 Kg./m | 3.49 | MT |
3 | Repairing of damaged portion of Pedestal by high early strength solvant free epoxy grout etc. complete as per direction of EIC. | 1584.00 | Kg |
4 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) - (c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work | 24.00 | Sqm |
5 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4m - (i) Tor steel/Mild Steel. | 4.11 | M.T. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054