Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
9648000.00 -
Document Cost
Refer Documents -
Estimated Cost
482397659.00
BOQ Items Total Items : 23 | Total Qty : 100721.68
# | Item | Quantity | Units |
---|---|---|---|
1 | Bill of Quantities | ||
2 | 1.Handling, lifting and removing of armor stone of various sizes from alignment of the existing revetment structure at sea side to the elevation of (+) 3.10 meters or as directed by the Nodal Officer to suite the site condition and stacking the same within a lead of 1km and reinstatement of the damaged revetment to its original position after assessment and weighing including all labour, tools, tackles, Cranes, plant, equipment, Machinery, transport, Fuel etc. Complete. Note: 1.The precise profile will be determined upon the submission of preliminary revetment levels prior to the commencement of work. 2.Weighment of the stone should be done before placing in revetment. | 16735.00 | 1 MT (One Metric Tonne) |
3 | 2.Dismantling the existing plain cement concrete in the damaged portion of Mass capping and wherever required as existing at site of work to the required size ,shape and level all as per relevant specification and directed at site of work including deposit the debris within a lead of 50m including all labour, tools, tackles, Cranes, plant, equipment, transport, Fuel etc. Complete. | 36.00 | 1 M3 (One Cubic Metre) |
4 | 3.Casting the Tetrapods with M35 Design Mix Cement concrete weighing minimum 5Te. as shown in the relevant drawing and as directed including all operations shuttering, vibrating, curing etc. all as per relevant schedule including testing of concrete, labour, material, tools, plants, equipment, fuel etc., Complete. | 11047.00 | 1No (One Number) |
5 | 4.Handling, transporting the newly cast 5Te.(approx.) Tetrapods from stack yard and placing at seaside slope of revetment as Armour unit in two layers all as per relevant drawing and as directed at site including handling operation, labour, material, tools, plants, equipment, transport, fuel etc., Complete. Note: 1. The Contractor shall engage Cranes of suitable capacity and boom length for easy handling and placing of Tetrapods at the required reach. 2. The Contractor shall engage skilled workmen for the work. | 11047.00 | 1No (One Number) |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054