ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Repair And Restoration Work Of, Digod - Tender Details
Explore tender information for Repair And Restoration Work Of in Digod, including eligibility, deadlines, and bid specifics.
WATER RESOURCES DEPARTMENT
Digod, Rajasthan, India
NTID 39617341
Opening Date : Tue 18th March, 2025
Closing Date : Mon 17th March, 2025
- ₹ 12382747.00
- NTID 39617341
Repair And Restoration Work Of Polaikalan Talab G.p. Polaikalan Tehsil Digod District Kota
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
247655.00 -
Document Cost
5000.00 -
Estimated Cost
12382747.00
BOQ Items Total Items : 25 | Total Qty : 37828.2
# | Item | Quantity | Units |
---|---|---|---|
1 | 10.1 Side shuttering including propping etc. complete (to achieve finish F 2 for Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc | 1815.790 | sqm |
2 | 10.10 Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. 10.10.1 In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete) | 618.230 | CUM |
3 | 10.9.2 Supplying of M.S. reinforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. 10.9.2.2 Tor or ribbed bars (IS :1786) | 7063.840 | KG |
4 | 11.12 Preparation of foundation of structure including removal of all loose stones, silt and final washing. 11.12.1 By manual labour | 922.200 | SQM |
5 | 18.1 Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. 18.1.2 Thick | 2325.000 | sqm |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054