ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRepair And Maintenance Work In, West Tripura - Tender Details
Explore tender information for Repair And Maintenance Work In in West Tripura, including eligibility, deadlines, and bid specifics.
TRIPURA UNIVERSITY
West Tripura, Tripura, India
NTID 39006363
- Opening Date : Tue 11th February, 2025
- Closing Date : Mon 10th February, 2025
- ₹ 0.00
- NTID 39006363
Repair And Maintenance Work In Roof And Others Related Works To The Quarter Of Prof Anirban Guha
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
5372.00 -
Document Cost
500.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 8 | Total Qty : 723.68
# | Item | Quantity | Units |
---|---|---|---|
1 | 17.14 Grading roof for water proofing treatment complete as required as per direction of the Engineer-in-charge with : 17.14.1 Cement concrete 1:2:4 (1 cement : 2 fine sand : 4 graded stone aggregate 20 mm nominal size). | 15.68 | CUM |
2 | 13.37 Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 60.00 | SQM |
3 | 13.37 Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 60.00 | SQM |
4 | 12.41 Finishing walls with acrylic smooth exterior paint of required shade of approved brand and manufacture [Payment shall be made after submission of Test Certificate issued by the Manufacturer] : 12.41.1 New work ( two or more coats applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 60.00 | SQM |
5 | 13.30 Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sqm and under including cutting the patch in proper shape and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground with all leads and lifts including finishing even and smooth and curing complete as per direction of the Engineer in charge:- 13.30.1 With cement mortar 1:3 ( 1 cement : 3 fine sand ). | 60.00 | sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054