ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Renovation Work Of Shamshan Gh, Noida - Tender Details
Explore tender information for Renovation Work Of Shamshan Gh in Noida, including eligibility, deadlines, and bid specifics.
Greater Noida Industrial Development Authority
Noida, Uttar Pradesh, India
NTID 39347163
Opening Date : Thu 27th February, 2025
Closing Date : Mon 24th February, 2025
- ₹ 588136.00
- NTID 39347163
Renovation Work Of Shamshan Ghat In Village Chuharpur Khadar, Greater Noida.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 21 | Total Qty : 3192
# | Item | Quantity | Units |
---|---|---|---|
1 | Cleaning jungel including up rooting of rank, vegetations grass, push, wood trees and samplings of grith upto 30cms. Measured at a height of 1M above ground level and removal of rubbish up to a distance of 50M out side the periphery of area cleared. (SOR/4.06) 259(i) | 1023.75 | Sqm |
2 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50M. And lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation trenches. (where machine can not reach/move). For building work only. (UPPWD/SOR-2020/251(A)) | ||
3 | Depth from 0.0 to 1.5M Below G.L. | 8.00 | Cum |
4 | Cement concrete with 4cm gauge appoved stone ballast course sand & cement in theproporation of 8:4:1 including supply of all materials labour tools &plants etc reqired for proper completion of the work | ||
5 | 8:4:1(1 Cement :4 course sand :8 greaded stone aggregate 40mm nominal size) (S.O.R/ 5.4.3) | 15.22 | Cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054