ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Renovation Repairing And Modif, Guwahati - Tender Details
Explore tender information for Renovation Repairing And Modif in Guwahati, including eligibility, deadlines, and bid specifics.
Assam Police Housing Corporation Ltd
Guwahati, Assam, India
NTID 39340096
Opening Date : Thu 13th March, 2025
Closing Date : Wed 12th March, 2025
- ₹ 3936814.00
- NTID 39340096
Renovation Repairing And Modification Of Existing Assam Type Gymnasium Hall And Construction Of New Assam Type 1st Floor In Existing Rcc Portion Of Table Tennis Indoor Stadium At Zone Ii Aphq Ulubari Guwahati.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
78736.00 -
Document Cost
787.00 -
Estimated Cost
3936814.00
BOQ Items Total Items : 56 | Total Qty : 8574.5995
# | Item | Quantity | Units |
---|---|---|---|
1 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: G.S. Sheet. | 106.9000 | M2 |
2 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. With cement mortar 1:4 (1cement: 4 coarse sand) | 63.0000 | M2 |
3 | Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and disposal ofunserviceable materials within 50 metres lead. | 54.0000 | M2 |
4 | Hacking of CC flooring including cleaning for surface etc. complete as per direction of the Engineer-in-Charge. | 84.3400 | M2 |
5 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm | 5.7300 | M2 |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054