- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of GOVERNMENT OF JHARKHAND
- >
NTID 39807175
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Renovation Of Office Building , Deoghar - Tender Details
- Opening Date : Fri 4th April, 2025
- Closing Date : Thu 3rd April, 2025
- ₹ 9598216.00
- NTID 39807175
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
192000.00 -
Document Cost
10000.00 -
Estimated Cost
9598216.00
BOQ Items Total Items : 116 | Total Qty : 17570816.599
# | Item | Quantity | Units |
---|---|---|---|
1 | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 15.120 | M3 |
2 | Dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 0.680 | M3 |
3 | Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 3.020 | M3 |
4 | Earthwork in excavation in foundation trenches in ordinary soil ( vide classification of soil item -A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling,ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, building specification and direction of Ei I S.O.R item no -5.1.1 | 47.520 | M3 |
5 | Providing P.C.C.M-l50 rn nominal mrx of (1'2"4) in foundation with approved quality of stone chips 20 mm to 6 mm size graded and clean coarse sancl of F M.2 5 to 3 including screening, shuttering mixing cement concrete in mixer and placrng in position' lvibrating, strrking, curing, taxes and royalty all complete as per specification and direction of Engineer-in-charge' S.O.R item no -5.3.2 | 2.970 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054