Tender for WATER RESOURCES DEPARTMENT - NTID 29347969
WATER RESOURCES DEPARTMENT
Latehar, Jharkhand, India
NTID 29347969
- Opening Date : Thu 13th October, 2022
- Closing Date : Tue 11th October, 2022
- ₹ 5491335.00
- NTID 29347969
Renovation Of Kachanpur M.i Scheme, Block-barwadih, Dist-latehar
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
110000.00 -
Document Cost
10000.00 -
Estimated Cost
5491335.00
BOQ Items Total Items : 34 | Total Qty : 5469686.475
# | Item | Quantity | Units |
---|---|---|---|
1 | Jungle clearance in borrow area,building permisses ,flanks and slope of dam embankment by removing the grass a the jungle bushes from the top including weding out shrubs including roots and levelling etc.All complete as per specificition and direction of E/I ( sor no -part -B 5.1.3.1,part -A 2.3(ii) a page No. -150) | 0.962 | Ha |
2 | E/W stripping by hydraulic M/C in grade A&B type of soil including moorum soil, soil mixed with kankar, pebbles and boulder up to 300 mm size and disposal of the same along with all organic material in the country side beyond 150 m upto 500 m in all by tipper including construction and maintainance of haul road etc all complete as per specification and direction of E/I(WRD-5.1.6.1) | 1443.150 | M |
3 | E/W in excavation and filling in canal by hydrauilc excavator as per designed section in ordinary soil(vide classification of soil item -A) and making the bank with excavated earth in proper profile and clod breaking and laying earth in 225 mm layers with initial lead of 10 m and all lfts all complete job as per specification and direction of E/I(WRD-7.1.43.3.) | 5324.044 | M |
4 | E/W in excavation and filling in canal by hydrauilc excavator as per designed section in ordinary soil(vide classification of soil item -A) and making the bank with excavated earth in proper profile and clod breaking and laying earth in 225 mm layers Up to 500 m and all lfts by tipper including construction and maintainance haul road all complete job as per specification and direction of E/I(WRD-7.1.43.4.) | 7986.066 | M |
5 | Labour for rolling and compacting earth laid in 150mm to 225 mm layers by manual layers means with ci hammer to achieve minimum 85 % mdd including supply of water and necessary tools and plants. with all lead and lifts -do-do-as per specification and direction of E/I(WRD-7.1.38) | 13310.110 | M |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane