ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Renovation Of Hotel Hamir Hami, Shimla - Tender Details
Explore tender information for Renovation Of Hotel Hamir Hami in Shimla, including eligibility, deadlines, and bid specifics.
Himachal Pradesh Tourism Development Corporation Limited
Shimla, Himachal Pradesh, India
NTID 39387542
Opening Date : Fri 7th March, 2025
Closing Date : Fri 7th March, 2025
- ₹ 5853102.00
- NTID 39387542
Renovation Of Hotel Hamir Hamirpur Distt. Hamirpur H.p
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
117000.00 -
Document Cost
2000.00 -
Estimated Cost
5853102.00
BOQ Items Total Items : 127 | Total Qty : 10555.55
# | Item | Quantity | Units |
---|---|---|---|
1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking the useful material in specified manners as per the direction of Engineer-In-Charge and disposal of unserviceable materials in all leads and lifts. For thickness of tiles 10mm to 25 mm | 350.23 | Per Square Meter |
2 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish within all leads and lifts and stacking the useful material in specified manners as per the direction of Engineer-In-Charge. | 430.67 | Per Square Meter |
3 | Demolishing cement concrete manually/ by mechanical means including stacking the useful material in specified manners as per the direction of Engineer-In-Charge and disposal of unserviceable materials in all leads and lifts. Nominal concrete 1:4:8 or leaner mix (including equivalent design mix). | 12.15 | Per Cubic Metre |
4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all works upto plinth level 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 15.19 | Per Cubic Metre |
5 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level Cement mortar 1:3 (1 cement :3 coarse sand) as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 20.08 | Per Square Meter |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054