Renovation Of First Floor Meet, Bengaluru - Tender Details
Explore tender information for Renovation Of First Floor Meet in Bengaluru, including eligibility, deadlines, and bid specifics.
INDIAN INSTITUTE OF ASTROPHYSICS
Bengaluru, Karnataka, India
NTID 39373733
Opening Date : Tue 11th March, 2025
Closing Date : Mon 10th March, 2025
- ₹ 989100.00
- NTID 39373733
Renovation Of First Floor Meeting Room At Main Lab Building At Crest Campus Of Iia, Hosakote, Bengaluru Rural District
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
Refer Documents -
Document Cost
Refer Documents -
Estimated Cost
989100.00
BOQ Items Total Items : 40 | Total Qty : 2105
# | Item | Quantity | Units |
---|---|---|---|
1 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complet as per directions of Engineer-in-charge. | 15.00 | cum |
2 | Drilling with core cutting machine in RCC slabs, walls etc.wherever required in buildings, manholes,ducts, water tanks, pits etc. for laying pipes,sleeves and making good the same to give an even finish . The rate shall include the cost of drilling core, providing EPOXY based water proofing compound for sealing the joints around the pipes, nominal reinforcement wherever required,scaffolding and labour charges for working at all levels ,leads and heights. (Maximum thickness of RCC members shall be 300mm) and as directed by Engineer-In-Charge. | ||
3 | 15mm to 75mm dia | 4.00 | each |
4 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | 80.00 | sqm |
5 | Providing and applying white cement based putty of average thickness 1mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 50.00 | sqm |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.