ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Corrigendum Remaning Work Co, SANCHORE - Tender Details
Explore tender information for Corrigendum Remaning Work Co in SANCHORE, including eligibility, deadlines, and bid specifics.
Public Works Department
SANCHORE, Rajasthan, India
NTID 39310461
Opening Date : Fri 7th March, 2025
Closing Date : Thu 6th March, 2025
- ₹ 13000000.00
- NTID 39310461
Corrigendum : Remaning Work Construction Approach Road For Unconnected Revenue Village Rj-18-04/rr/srf/2023-24
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
260000.00 -
Document Cost
1000.00 -
Estimated Cost
13000000.00
BOQ Items Total Items : 29 | Total Qty : 105757.75
# | Item | Quantity | Units |
---|---|---|---|
1 | (A) Jagdambanagar Km 0/00 to 4/000 Earth work in excavation, including stacking/disposal of surplus material with all lifts and lead upto 495 metres, exclusive of compensation of earth [MoRTH specification : Clause 301 to 305] In Hard Soil When excavation and loading is done mechanically using Bull Dozar, F.E.Loader and carriage is done by tipper/dumper (6T capacity). | 2481.25 | cum |
2 | Compensation for earth, taken from private land with all lead and lift (Land to be arranged by private negotiations by the contractor) [MoRTH Specification : Clause 301to 305]. | 2354.25 | cum |
3 | Extra for laying earth as per specification for compaction in 200 mm thick loose layers and dressing [MoRTH Specification Clause 305.3.5].BY MECHANICAL MEANS, using Motor Grader, from earth in stock piles with all lead and lift but excluding rolling and watering. | 2368.75 | cum |
4 | Extra for watering the earth to bring the earth upto required O.M.C excluding rolling | 10368.75 | cum |
5 | Extra for rolling to specification with the use of Vibratory roller when earth is at suitable moisture content with desired field density not less than 100% of maximum dry density (Modify Heavy Proctor test).excluding watering. | 10368.75 | cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054