Remaining Road And Drain Construction Work In Mohalla Rajiv Nagar.

Tendering Authority: Gorakhpur Development Authority

India, Uttar Pradesh, Gorakhpur

NTID

29112864

Last Date For Submission

10 Oct, 2022

Closing Date

10 Oct, 2022

BOQ Items
# Item Quantity Units
1 Scraping of old pitch road (Approved Rate) 98.00 Sqm
2 Dismentling of old interlocking tile (Approved Rate ) 92.00 Sqm
3 Construction of granular sub base by providing course graded materials spreading in uniform layers etc completed. SI 401 (Approved Rate) 300.00 Cum
4 E/W filling with cartage upto 08km distance including dressing levelling etc. MORTH AR 297.00 Cum
5 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately). All works upto plinth level (D.S.R. No-5.33.1/2018) 150.00 Cum
6 Providing and laying 125 micron polythene sheet under the over sub base to as speration betuween sub base & concrete slab i/c supply of all material labour(US-3) Approved Rate 1000.00 Sqm
7 P/L of factory made 80mm thick rubber moulded interlocking Cement Concrete Tiles (30mpa) including 25mm thick compacted bed of fine compacted and proper embedding /laying of interlocking tiles leveliing and dressing of surface to required level and slope, filling joints with fine sand including the cost of material, labour T&P etc. required for proper completion of the work.SOR New Item 1 1890.00 Sqm
8 Brick edgeing on both sides 9'' deep and 4.5'' wide with first class brick SI-765 10.00 Rmt
9 P/f in position rubberised hot sealing compund for expansion joints DSR-16.46.1 10.00 Rmt
10 E/W filling with cartage upto 08km distance including dressing levelling etc. MORTH AR 400.00 Cum
11 Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5m. & lead upto 30m. Including filling , watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royalty) SOR SI-251 50.00 Cum
12 Concrete with 4.00cm (1 ") gauge approved stone ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of materials, labour T&P etc. required for the proper completion of the work. (S.I.NO-281) 15.00 Cum
13 M-150 class brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. SORSI-305 100.00 Cum
14 12 mm thick plaster in 1:4 cement and coarse sand mortar SI-584(a) 70.00 Sqm
15 Cement concrete with 2.0 cm gauge approved stone ballast, approved coarse sand and cement in the proportion of 4:2:1 including supply of materials, labour and tools plants etc. required for the proper completion of the work.SOR SI-279(i) 15.00 Cum
16 R.C.C. work with cement approved coarse sand and 2.0cm (3/4") gauge approved stone grit in the proportion of 1:1 :3 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and biding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all material, labour and T&P etc. required for proper completion of the work. binding wire cost being included in the item. (S.I.No-284A) 6.00 Cum
17 Mild steel or iron work in plain work such as in reinforced concrete or reinforced brick work (when not included in over all r ates) wrought to required shapes as necessary and bending for the proper completion of the work and including supply of steel and its wastage etc. and all labour and plants required for proper completion of work note: the steel shall be bent cold and all bends hooks and authorised over lapping shall be measured. (as per Analysis) 6.00 Qtl