Tender for Director Cum Chief Engineer RED - NTID 31330236
Director Cum Chief Engineer RED
Pilibhit, Uttar Pradesh, India
NTID 31330236
- Opening Date : Thu 23rd March, 2023
- Closing Date : Thu 23rd March, 2023
- ₹ 0.00
- NTID 31330236
Reconstruction Work Of Primary School In Village Mati Mafi, Block Puranpur
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
28000.00 -
Document Cost
854.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 35 | Total Qty : 1814.39
# | Item | Quantity | Units |
---|---|---|---|
1 | E/W in excavation foundation in ordinary soil loam,clay or sand including lift upto 1.5 m. & lead upto 30m including filling watering & ramming of excavated earth into the trenches or in to th plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches. ( S.I No-251) | 39.59 | cum |
2 | Providing & injecting chemical for preconstrucional treatment and creating and chemical barrier under and around the columns pits, wall trench basement excavation top surface if plinth filling junction of wall The rate of applicstion of chemical emulsion shall be as follows. 1).Treatment for massonary and foundation 5 lit per sqm.. 2.) Back fill in immidiete contact with foundation 7.5 lit per sqm.3)Treatment for surface of plinth filling 5 mtr per sqm 4) Treatment of soil along exetranal permeter of building 7.5 lit per sqm 5) treatment of soil under rxetranal permeter 5 lit per sqm No. Chapter No. 08. new item No. 2) | 63.21 | sqm |
3 | Concrete with 40mm gauge brick ballast coarse sand of 2.20 fineness modulous & Cement in proporation of 8:4:1 in foundation and under floor, includingsupply of all material labour and T&P etc. required for proper completition of the work.(S.I. No. 275) | 6.33 | cum |
4 | M-150 class Brick work in 1:6 Cement & and Coarse sand mortor in foundation & plinth including supply of all materials, labour and T&P etc. Required for proper completion of the work. (S.I No.303) | 24.09 | cum |
5 | RCC Work With cement, approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in Plinth Beam e.(S.I. No. 283A) | 6.10 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane