Reconstruction Of Minor Bridge, Kanchipuram - Tender Details
Highways Department
Kanchipuram, Tamil Nadu, India
NTID 39793803
- Opening Date : Wed 9th April, 2025
- Closing Date : Wed 9th April, 2025
- ₹ 23500000.00
- NTID 39793803
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
128000.00 -
Document Cost
Refer Documents -
Estimated Cost
23500000.00
BOQ Items Total Items : 68 | Total Qty : 140856.33
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water, shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL. | ||
2 | Minor Bridge | 218.03 | Cubic Metre |
3 | Providing and driving in position permenent MS liners for piles from bottom of pile cap as per cl.709.1.4 of IRC 78 - 2014 (up to maximum scour level) including cost of liners and fabricating, welded construction with consumables, labour and plants and driving MS liner 6mm thick to be left permenantly with the pile shaft as per requirement and as per specification and placing them in position with all lead and lift etc. complete. | ||
4 | Minor Bridge | 5.92 | Tonne |
5 | Providing Reinforced Cement Concrete cast-int-situ bored PILES of 1000mm diameter in vibrated RCC M35 (Design mix) using 20mm and below HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel and placing it in position before concreting setting up of piling equipment, shifting the same from one pile location to another pile location, dismantling them and reerceting as necessary including all labour for driving or boring and providing temporary casing where required through all soils, leading the excavated earth to a distance of 200m including forming of working platform over the river bed of acomodating piling equipment including working platform etc., forming approaches to the working platform, mixing concrete, filling it in position, compacting, cutting of pile head to cut off level for casting pile cap, including diversion of water course if necessary and all other incidental charges etc., complete as per standard specifications, forming and maintaining protective bunds and all other incidental charges etc., complete for PILES BELOW PIERS AND ABUTMENTS. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054