Facebook
Description

Rdss Scheme Work Contract For Erection Of Ht Lt Lines And Distribution Tfr With Dts Of Morthana 11 Kv Feeder At 110 11paravakkal Ss Under Agri Feeder Segregation Of Rdss Scheme In Paravakkal Section In Gudiyatham Division Of Tedc Tirupattur Circle

Tendering Authority: TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED

India, Tamil Nadu, Gudiyatham

NTID

29044299

Last Date For Submission

29 Sep, 2022

Closing Date

29 Sep, 2022

BOQ Items
# Item Quantity Units
1 EXCAVATION OF POLE PITS / Stay Set:
2 For pole upto 8.00m length by using JCB/Manual 16 per pit
3 For pole above 8.00m length by using JCB/Manual 58 per pit
4 In Hard Soil (common to all size of poles) 60 per pit
5 In rocky area (common to all size of poles) by blasting / Manual 15 per pit
6 Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual 60 per pit
7 ERECTION OF POLES AND ACCESSORIES
8 Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual 16 per pole
9 Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual 125 per pole
10 Erection of metal supports above 9m / RSJ / Rail Pole/Tubular Poles 8 per pole
11 Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. 60 Each set
12 Fixing of Line Materials
13 V cross arm, Tapping cross arm & Guarding cross arm 266 per Loc
14 Fixing of LT S phase cross arm 2 per Cross arm
15 Fixing of LT 3 phase cross arm 117 per Cross arm
16 Fixing of HT / LT Ti fitting 92 per Loc
17 Fixing of HT PIN insulator with Pin 11 kv 621 per
18 Fixing of HT PIN insulator with Pin 33 kv 3 per
19 Fixing of LT PIN insulator 17 per
20 Fixing of HT strain disc 11 KV 225 per
21 Fixing of Two Tapping cross arm per cut point upto 33 KV line including fixing of Discs,insulators and Jumpering etc.. 1 per Loc
22 Set right of all sizes of leaning poles 10 per pole
23 Fixing of shackle 71 per
24 Fixing of Aluminium knob 32 per
25 STRINGING OF CONDUCTORS:
26 Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor 0.756 Per KM(Route Length)
27 Paving and stringing of conductors of above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor 11.192 Per KM(Route Length)
28 Paving and stringing of conductors of 7/4.09mm ACSR or other equivalent conductor 7.519 Per KM(Route Length)
29 Releasing and reerection (resagging) of one run of all sizes of conductor 1.085 Per KM(Route Length)
30 ERECTION OF DISTRIBUTION TRANSFORMERS:
31 Erection of 11 KV single pole Structure including erection of DT complete without centre support (Data as per Annexure III) 20 Per structure
32 ERECTION OF DP STRUCTURE:
33 Erection of single pole DP with complete and with single earth 2 Per structure
34 CONCRETING WORKS:
35 Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) (i) Mass concreting of poles 171 Per pole
36 (ii) Sleeve concreting 60 Per Loc
37 EARTHING:
38 (i) Earthing of poles with GI wires 4 or 6 SWG by coil earthing 133 Each
39 (ii) Provision of spike including earthing arrangement 10 Per Loc
40 LOADING AND UNLOADING CHARGES:
41 Loading or unloading of Distribution Transformer (i) Upto 100 KVA 20 Each
42 (i) REC, RCC, PSC pole upto 8.00 m length 16 Per pole
43 (ii) All REC, RCC pole above 8.00 m length 147 Per pole
44 (iii) Metal poles all sizes 8 Each
45 (i) REC, RCC, PSC pole upto 8.00 m length 16 Per pole
46 (ii) All REC, RCC pole above 8.00 m length 147 Per pole
47 (iii) Metal poles all sizes 8 Each
48 Loading of Conductor 8 Per drum
49 Unloading of Conductor 8 Per drum
50 Loading / Unloading of line materials 10 Per tonne
51 Loading / Unloading of 11 KV strain disc 19 Per Crate
52 Loading / Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc., 7 Per 100
53 Guarding Arrangement
54 Provision of guarding with two numbers earth pits excluding stay set erection
55 (i) Flat guarding with earth pit 11 Per span
56 TRANSPORTATION CHARGES:
57 Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM 163 Per pole
58 Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) upto 5 KM 163 Per Pole
59 Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM 163 Per Pole
60 Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor 19.467 Per KM (Distance
61 (i) Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) 10 Upto one tonne
62 Dismantling Charges
63 Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit 25 Per pole
64 Dismantling of conductor of upto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils 3.256 Per KM
65 Dismantling of Cross arm clamps TI fitting hardwares, insulators etc., 58 Per Location
66 PAINTING:
67 Numbering of poles including base painting and with cost of paint 171 Per pole
68 Painting of iron poles up to 40 ft 200/100 length with double coats including cost of paint 8 Each
69 Painting of Cement poles by Distember coating including cost of distember 145 Per pole
70 Painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details (Items 1 to 6 brush to be owned by the contractor)(Paint to be supplied by Department) 20 Per str
71 MISCELLANEOUS WORKS :-
72 (iii) DT Yard cleaning 20 Per Structure
73 WORKSHOP CHARGES :-
74 Manufacturing/ Altering of clamps 200 Each
75 Drilling of holes in the structure materials clamps etc. 500 Per hole
76 AB switch or open type side arm stud, cutting and drilling holes. 30 Per set
77 Manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe 60 Per str.
78 GENERAL
79 Jungle clearance such as Kattu Karuvai in the various area without uprooting 2000 SQ.mtr
80 Jungle clearance such as Kattu Karuvai in the various area with uprooting 2000 SQ.mtr
81 Clearing of Tree brances of coconut tree 200 Per tree
82 Clearing of Tree brances of Neem, Tamerined, country etc 200 Per tree
83 Leveling of Ground using Bul Dozer 30 Per Hour
84 Cleaaring of Branches/ Trees with JCB 50 Per Hour
85 Fencing of Distribution Transformer Structure at road side- Fabrication and Erection. (Including all materials) 20 Set
86 E.P.F. @13 % should be Entered by the Bidder 1 Percentage
87 E.S.I. @3.25 % should be Entered by the Bidder 1 Percentage
88 G.S.T. @18% should be Entered by the Bidder 1 Percentage
Tender InquiryInquiry