Rdss Scheme Work Contract For Agriculture Feeder Segregation Of 11kv Pakkam Feeder Fed From 33 11kv Sathiyamangalam Sub Station Of Gingee Division

Tendering Authority: TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED

India, Tamil Nadu, Sathiyamangalam

NTID

28831008

Last Date For Submission

06 Oct, 2022

Closing Date

06 Oct, 2022

BOQ Items
# Item Quantity Units
1 Work item
2 Excavation of pole pit for pole 8.00m length by using JCB/Manual 5 per pit
3 Excavation of pole pit for pole 9.00m length by using JCB/Manual 176 per pit
4 Excavation of pole pit for pole RSJ 40'' pole length by using JCB/Manual 34 per pit
5 Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual 122 per pit
6 Erection of PSC poles 8.00m length by using Crane / Manual 5 per pole
7 Erection of PSC Pole 9.00 mtr length by using Crane/ Manual 176 per pole
8 Erection of RSJ Poles 40'' by using Crane / Manual 34 per pole
9 Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. 122 Each set
10 Fixing of V cross arm 3.5 feet 182 per Loc
11 Fixing of LT 3 phase cross arm 23 per cross arm
12 Fixing of HT / LT TI fitting 203 per Loc
13 Fixing of HT PIN insulator with Pin 11 KV 665 per
14 Fixing of LT PIN insulator 12 per
15 Fixing of HT strain disc 11 KV 294 per
16 Fixing of two tapping X arm per cut point 11 KV line including fixing of disc, insulators and jumpering etc. 39 per Loc
17 Fixing of shackle 90 per
18 Fixing of Aluminium knob 25 per
19 Paving and stringing of LT 3 Phase 4 wire line with conductor of size 7/3.35mm ACSR conductor 0.356 Per KM(Route Length)
20 Paving and stringing of LT 3 Phase 4 wire line with conductor of size 7/3.35mm ACSR conductor 0.181 Per KM(Route Length)
21 Paving and stringing of HT 3 Phase 3 wire line with conductor of size 7/3.35mm ACSR conductor 3.386 Per KM(Route Length)
22 Paving and stringing of HT 3 Phase 3 wire line with conductors of size 7/4.09mm ACSR conductor 7.985 Per KM(Route Length)
23 Erection of 11 KV Single Pole structure including erection of DT complete with centre support for 63KVA DT 9.000 Per str
24 Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., with 11 KV AB switch with 9 mtr Pole 3.000 Per str
25 Mass concreting of poles with 1:4:8 mix using 40 mm Jelly including curing (Material + labour) 215 per pole
26 Stay concreting with 1:4:8 mix using 40 mm Jelly including curing (Material + labour) 122 per loc
27 Earthing of poles with GI wires 4 SWG or 6 SWG by coil earthing 215 Each
28 Loading of Distribution Transformer 63 KVA 9 Each
29 Unloading of Distribution Transformer 63 KVA 9 Each
30 Loading of 8 mtr PSC Pole 5 per pole
31 Loading of 9mtr PSC pole 182 per pole
32 Loading of Square pole 9.14 mtr length 400 Kg 9 per pole
33 Loading of RSJ 40 feet pole 34 Each
34 Unloading of 8 mtr PSC Pole 5 per pole
35 Unloading of 9mtr PSC pole 182 per pole
36 Unloading of Square pole 9.14 mtr length 400 Kg 9 per pole
37 Unloading of RSJ 40 feet pole 34 Each
38 Loading of conductor 7/2.59, 7/3.35 and 7/4.09 mm ACSR Conductors 13 Per drum
39 Unloading of conductor 7/2.59, 7/3.35 and 7/4.09 mm ACSR Conductors 13 Per drum
40 Loading of Iron/Steel materials (all line materials ) 6 Per tonne
41 Unloading of Iron/Steel materials (all line materials ) 6 Per tonne
42 Loading of 11 KV Strain disc 74 Per Crate
43 Unloading of 11 KV Strain disc 74 Per Crate
44 Provision of guarding with two numbers earth pits excluding stay set erection Flat guarding with earth pit 22 per span
45 Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.5 Km 230 Per pole
46 Transporting of conductors of all sizes from road side to pit location 36.375 per Km (distance)
47 Transporting of Distribution Transformer / Line materials from stores to office / site 10 KM distance using 1 ton capacity Minidor (Lorry) 7 Upto 1 Ton
48 Numbering of Poles including cost of paint (One coat of Red oxide paint and two coats of Alumnium paint) 181 per pole
49 Painting of iron poles 40 ft length with double coats including cost of paint (One coat of Red oxide paint and two coats of Alumnium paint) 34 Each
50 Surveying of LT Line 10 per Loc
51 Surveying of HT Line 215 per Loc
52 Cleaning of bushes and tree cutting in HT Line 15 per Loc