Rdss Scheme Work Contract For Agriculture Feeder Segregation Of 11kv Thalavanur Feeder Fed From 33 11kv Keelpapampady Sub Station Of Gingee Division

Tendering Authority: TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED

India, Tamil Nadu, Gingee

NTID

28831005

Last Date For Submission

06 Oct, 2022

Closing Date

06 Oct, 2022

BOQ Items
# Item Quantity Units
1 Work item
2 Excavation of pole pit for pole 8.00m length by using JCB/Manual 119 per pit
3 Excavation of pole pit for pole 9.00m length by using JCB/Manual 542 per pit
4 Excavation of pole pit for pole RSJ 40'' pole length by using JCB/Manual 32 per pit
5 Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual 262 per pit
6 Erection of PSC poles 8.00m length by using Crane / Manual 119 per pole
7 Erection of PSC Pole 9.00 mtr length by using Crane/ Manual 542 per pole
8 Erection of RSJ Poles 40'' by using Crane / Manual 32 per pole
9 Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. 262 Each set
10 Fixing of V cross arm 3.5 feet 525 per Loc
11 Fixing of LT Single phase cross arm 39 per cross arm
12 Fixing of LT 3 phase cross arm 120 per cross arm
13 Fixing of HT / LT TI fitting 567 per Loc
14 Fixing of HT PIN insulator with Pin 11 KV 1710 per
15 Fixing of LT PIN insulator 177 per
16 Fixing of HT strain disc 11 KV 387 per
17 Fixing of two tapping X arm per cut point 11 KV line including fixing of disc, insulators and jumpering etc. 46 per Loc
18 Fixing of shackle 444 per
19 Fixing of Aluminium knob 198 per
20 Paving and stringing of LT 3 Phase 4 wire line with conductor of size 7/3.35mm ACSR conductor 4.819 Per KM(Route Length)
21 Paving and stringing of LT 3 Phase 4 wire line with conductor of size 7/3.35mm ACSR conductor 0.425 Per KM(Route Length)
22 Paving and stringing of HT 3 Phase 3 wire line with conductor of size 7/3.35mm ACSR conductor 19.787 Per KM(Route Length)
23 Paving and stringing of HT 3 Phase 3 wire line with conductors of size 7/4.09mm ACSR conductor 10.994 Per KM(Route Length)
24 Erection of 11 KV Single Pole structure including erection of DT complete without centre support for 16 KVA DT 3.000 Per str
25 Erection of 11 KV Single Pole structure including erection of DT complete without centre support for 25 KVA DT 7.000 Per str
26 Erection of 11 KV Single Pole structure including erection of DT complete with centre support for 63 KVA DT 26.000 Per str
27 Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., with 11 KV AB switch with 9 mtr Pole 7.000 Per str
28 Mass concreting of poles with 1:4:8 mix using 40 mm Jelly including curing (Material + labour) 574 per pole
29 Stay concreting with 1:4:8 mix using 40 mm Jelly including curing (Material + labour) 262 per loc
30 Earthing of poles with GI wires 4 SWG or 6 SWG by coil earthing 574 Each
31 Loading of Distribution Transformer 16 KVA 3 Each
32 Loading of Distribution Transformer 25 KVA 7 Each
33 Loading of Distribution Transformer 63 KVA 26 Each
34 Unloading of Distribution Transformer 16 KVA 3 Each
35 Unloading of Distribution Transformer 25 KVA 7 Each
36 Unloading of Distribution Transformer 63 KVA 26 Each
37 Loading of 8 mtr PSC Pole 119 per pole
38 Loading of 9mtr PSC pole 556 per pole
39 Loading of Square pole 9.14 mtr length 400 Kg 36 per pole
40 Loading of RSJ 40 feet pole 32 Each
41 Unloading of 8 mtr PSC Pole 119 per pole
42 Unloading of 9mtr PSC pole 556 per pole
43 Unloading of Square pole 9.14 mtr length 400 Kg 36 per pole
44 Unloading of RSJ 40 feet pole 32 Each
45 Loading of conductor 7/2.59, 7/3.35 and 7/4.09 mm ACSR Conductors 28 Per drum
46 Unloading of conductor 7/2.59, 7/3.35 and 7/4.09 mm ACSR Conductors 28 Per drum
47 Loading of Iron/Steel materials (all line materials ) 7 Per tonne
48 Unloading of Iron/Steel materials (all line materials ) 7 Per tonne
49 Loading of 11 KV Strain disc 97 Per Crate
50 Unloading of 11 KV Strain disc 97 Per Crate
51 Loading of LT Pin Insualtor, Shackle, Guy shackle, LT Pin, metal parts, HT pin etc 4 Per 100
52 Unloading of LT Pin Insualtor, Shackle, Guy shackle, LT Pin, metal parts, HT pin etc 4 Per 101
53 Provision of guarding with two numbers earth pits excluding stay set erection Flat guarding with earth pit 16 per span
54 Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.5 Km 743 Per pole
55 Transporting of conductors of all sizes from road side to pit location 113.322 per Km (distance)
56 Transporting of Distribution Transformer / Line materials from stores to office / site 10 KM distance using 1 ton capacity Minidor (Lorry) 43 Upto 1 Ton
57 Numbering of Poles including cost of paint (One coat of Red oxide paint and two coats of Alumnium paint) 542 per pole
58 Painting of iron poles 40 ft length with double coats including cost of paint (One coat of Red oxide paint and two coats of Alumnium paint) 32 Each