ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Rate Contract For Evacuation A, Bokaro - Tender Details
Explore tender information for Rate Contract For Evacuation A in Bokaro, including eligibility, deadlines, and bid specifics.
BOKARO POWER SUPPLY COMPANY (PVT.) LTD.
Bokaro, Jharkhand, India
NTID 39274059
Opening Date : Fri 7th March, 2025
Closing Date : Thu 6th March, 2025
- ₹ 46963000.00
- NTID 39274059
Rate Contract For Evacuation And Transportation Of Pond Ash For Backfilling Of Low Lying Areas.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
500000.00 -
Document Cost
Refer Documents -
Estimated Cost
46963000.00
BOQ Items Total Items : 1 | Total Qty : 1
# | Item | Quantity | Units |
---|---|---|---|
1 | a). Evacuation of ash from different filled up ash ponds of BPSCL up to all possible lift including dewatering, as required, loading by pay loader/excavator, washing the outside of dumper/trucks/hyvas as per specification/ direction of Engineer In- charge, The rate should include cost for sprinkling water at the excavation site. as per direction of Engineer-in-charge and specifications in conformity with pollution control norms and statutes, b) Nuisance free transportation of the ash in leak proof dumpers/trucks as per the specification and approved route and unloading at the disposal site / road construction Projects sites / end users place / any other designated places outside plant boundary) from BPSCL Ash pond or any other approved site as directed by the Engineer In- charge. The rate should include cost for sprinkling water at haulage route and disposal site, as per direction of Engineer In- charge and specifications in conformity with pollution control norms and statutes and c) Dozing of ash by dozer at disposal site including levelling the ground as per direction of the Engineer In-Charge and specifications in conformity with pollution control norms and statutes as per Scope of Work and Schedule of Rate | 1.000 | lumpsum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054