ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowPu Based Roof Waterproofing Sy, Ranchi - Tender Details
Explore tender information for Pu Based Roof Waterproofing Sy in Ranchi, including eligibility, deadlines, and bid specifics.
Mecon Limited
Ranchi, Jharkhand, India
NTID 38968814
- Opening Date : Fri 7th February, 2025
- Closing Date : Thu 6th February, 2025
- ₹ 0.00
- NTID 38968814
Pu Based Roof Waterproofing System In Head Office Buildings Of Mecon , Ranchi
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
50000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 12 | Total Qty : 33820
# | Item | Quantity | Units |
---|---|---|---|
1 | Providing and laying spray/roller/brush applied system for waterproofing on roofs as per the procedure given here, including necessary precautionary measures complete with all bye-works as per specification and as directed by the engineer / consultant for the following activities : | ||
2 | Dismantling :Dismantling of existing tarfelt membrane and haunch portion of brick bat-coba at junction of parapets from the roof slab and open up the surface, including cleaning , Removing all loose material, debris with suitable tools( preferably hammer, chisel) and disposing off the debris to ground level upto a lead of 1km, all materials, tools, plant & labour complete in all respect. | 5500 | Sqm |
3 | Providing and supplying Levelling course (minimum 50 mm thick) on top of exposed brick bat coba layer using M15 screed (with 10 mm downgraded aggregates) on entire surface to prepare a smooth levelled surface before PU application. | 5500 | Sqm |
4 | Providing, supplying and laying trowel finish with neat cement punning @ 1 Kg/sqm of the area mixed with water proofing compound on green concrete surfaces of 1 kg/sqm of the area on green concrete surfaces of roof after screed as specified and/or as shown in the drawings, all materials and labour complete. | 5500 | Sqm |
5 | Removal of loose/broken plaster on parapet walls including cleaning and disposing off the debris to ground level upto a lead of 50m, all materials, tools, plant & labour complete in all respect as directed by engineer. | 250 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054