ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Provn Of Prepaid Smart Meters , Jammu - Tender Details
Explore tender information for Provn Of Prepaid Smart Meters in Jammu, including eligibility, deadlines, and bid specifics.
Military Engineer Services
Jammu, Jammu and Kashmir, India
NTID 39437094
Opening Date : Fri 28th March, 2025
Closing Date : Fri 21st March, 2025
- ₹ 83500000.00
- NTID 39437094
Provn Of Prepaid Smart Meters And Energy Efficient Lightning System In Military Station Jammu And Pathankot
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
742500.00 -
Document Cost
3000.00 -
Estimated Cost
83500000.00
BOQ Items Total Items : 43 | Total Qty : 102121
# | Item | Quantity | Units |
---|---|---|---|
1 | Supply, installation, testing & commisioning of Smart Meters of defferent makes (not more than 33% of individual make to ensure interchangeablity at a later stage) as per BIS-16444 with communication technology including GPRS /RF/Hybrid (RF+GPRS)/ any other advanced technology as per CEA/Trai regulation, Single phase AC Meter Tamper Proof, Static Meter of class 1.0, 215 V, 50 Hz, 10 A-60A conforming to IS-16444: 2015 (Re affirmed 2020) and relevant IEC standard with inbuilt cellular/inbuilt 865-867 MHz Radio frequency communication facility with self healing mesh network with default and on demand display, billing data generation facility, anti-tamper features, micro processor and LED/LCD based circuitry meter should support sending the following data :- (a) 15 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, monthly billing survey for Cumulative Energy and Max Demand to software Meter should have connect / disconnect functionality operable from MDM/billing software and prepaid feature would be MDM / Billing as IS 15959 part 2. (b) The meter should support open communication protocol DLMS with the software complete all as specified and directed by Engineer-in-Charge. | 4337.00 | EACH |
2 | Supply, installation, testing, commisioning of Smart Meters of defferent make (not more than 33% of individual make to ensure interchangeablity at a later stage) as per BIS-16444 with communication technology including GPRS /RF/Hybrid (RF+GPRS)/ any other advanced technology as per CEA/Trai regulation, Three phase AC Meter Tamper Proof, Static Meter of class 1.0,215 V, 50 Hz, 10 A-60A conforming to IS-16444: 2015 (Re affirmed 2020) and relevant IEC standard with inbuilt cellular/inbuilt 865-867 MHz Radio Frequency communication facility with self healing Mesh network with default and on demand display, billing data generation facility, anti-tamper features, micro processor and LED/LCD based circuitry meter should support sending the following data : 15 min instantaneous data for voltage, current, power have connect / disconnect functionality operable from MDM/billing software and prepaid feature would be MDM / Billing end as IS 15959 part 2. The meter should support open communication protocol DLMS with the software. Note for Ser item No 1 and 2 (a) The contractor shall be responsible for removing the existing meter, noting down the reading and depositing it with GE. It shall be possible to integrate meter and DCU of any make as approved by GE with software as being provided. (b) It should be possible to run the meter in both prepaid and postpaid mode. (c) The meters would carry 10 years warranty. | 620.00 | EACH |
3 | (d) OEM shall to share the Authentication / Encryption keys of the meters along with relevant protocol details with GE. it shall be possible to intergrate meter of any make as approved by GE with same DCU software and cloud server as being provided. Meter should support communication protocol through RF/5G/4G/NB lot with software all as required at site and directed. (e) The meter cost includes the cost of DCU and repeaters as required. (f) The cost of the cellular meter would include 2 Years recurring telecom charges. For RF METERS DCU telecom charges during the defect liability period are included in overall cost quoted. (g) All RF meters shall be based on MESH "TECHNOLOGY" (h) OEM will share meter authentication & encryption password for integartion with third party software. (j) 2 No. DCU and 01 No. repeater shall be supplied as "SPARE" within overall cost quoted. | ||
4 | (k) DCU shall have following features:- (I) IP-67 protection compatible for remote Automatic Metering Infrastructure (AMI) solution and capable of communicating with the smart energy Meter in the corresponding frequency band and with the data server through GPRS/Ethernet. It would have internal memory to store data of at least 200 modules. It shall have inbuilt battery back-up. It shall support auto discovery of the meters and self healing mechanism for the breaks in the RF network. (ii) It shall be able to configure the communication with underlying nodes/ meters. (iii) It should be able to pull data at configuarable frequency from the nodes/ meters. (iv) DCU would support on demand data from nodes. (v) DCU would support data transfer via cellular / optical fiber communication. In case of cellular communication, it would support dynamic IP sim from any telecom service provider (minimun 4G and fallback to 2G). (vi) DCU would be able to communication to the nearest meters directly. For farther meters, it would allow communication through existing meters via MESH or other formation. | ||
5 | Supply and Configuration of the Web based Software with following modules: (i) Meter Data Management module:- The meter data management modules would be responsibe for collecting the data from the concentrator and make the data available to the billing system. The meter data management system would capture and provide the following data: (a) 30 min instantaneous data from all the meters for seven parameters- Cumulative Engery, Cumulative Apparent Engery (as applicable), Power, Current, Voltage, Power Factor and Frequency. (b) Monthly billing survey data for cumulative engery and max demand. (ii) Post / Prepaid Billing Module:- The billing module would collect the data from the meter data management module, calculate the engery consumption, calculate the energy construction, calculate billing daterminant and make engery data available to admin and end users. The billing module would include functionalities for tarriff setup, bill format setup, bill adjustment, occupation billing and vacation billing. It would allow postpaid functionality as required. (iii) Occupation and Vacation Modules:- The system would support occupation / vacation and billing reports. The software would be collecting data from DCU. The software would provide access to staff as well as the occupant for the data. | 4957.00 | EACH |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054