Description
Provision Of Synthetic Track At Ats Belgavi Special Work
BOQ Items Total Items : 93 | Total Qty : 65295.41
# | Item | Quantity | Units |
---|---|---|---|
1 | Schedule 'A' Part -I (B/R Works) Grubbing up tree trunks of girth exceeding 30 cm and not exceeding 100 cm including cutting of trunk portion protruding over ground, digging out roots filling holes and levelling off ground stacking of serviceable material and removing of unserviceable material to a distance not exceeding 5 Km and clearing site complete all as specified and as directed. | 10.00 | Each |
2 | Grubbing up tree trunks of girth exceeding 100 cm and not exceeding 150 cm including cutting of trunk portion protruding over ground, digging out roots filling holes and levelling off ground stacking of serviceable material and removing of unserviceable material to a distance not exceeding 5 Km and clearing site complete all as specified and as directed. | 5.00 | Each |
3 | Surface dressing of the ground including removing vegetation and in equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m for hard dense soil. Note: This item will not be operated for areas covered under items 4 & 5 . | 9680.00 | Square Metre |
4 | Surface excavation not exceeding 30cm deep and averaging 27cm deep and getting out in hard/dense soil all as directed. | 7120.00 | Square Metre |
5 | Excavation in trenches not exceeding 1.50 m wide and not exceeding 1.50m depth for foundation and also for laying of cables etc and getting out in hard/dense soil all as directed. | 1629.00 | Cubic Metre |
