Tender for Archaeological Survey of India - NTID 30064274
Archaeological Survey of India
Aurangabad-MH, Maharashtra, India
NTID 30064274
- Opening Date : Fri 16th December, 2022
- Closing Date : Thu 15th December, 2022
- ₹ 619933.00
- NTID 30064274
Providing Erection Of R.o. Plant Under Mw Providing Tourist Facilities R.o. Plant And Diesel Generator Set Etc. At Ellora Group Of Caves, Ellora Dist-aurangabad Part- I
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
15498.00 -
Document Cost
Refer Documents -
Estimated Cost
619933.00
BOQ Items Total Items : 13 | Total Qty : 41.431
# | Item | Quantity | Units |
---|---|---|---|
1 | Erection of R.O.Plant:- | 1.000 | non |
2 | Erection of R.O. Plant in front of cave no.29:- Erection and installation of protection shed for RO Plant of size 3.65 mtr.x4.57mtr.and 3.14 m height with fixing 10 Nos.vertical 40x40mmx 2mm thick MS Square pipe frame at equally distance of height 3.65 Mtr. And for horizontal for middle 1 Sq. Pipe and for top 4 nos. Pipe of 3.65 mtr. And 3 Nos. Pipe of 4.57 mtr length of 40mmx40mmx 2mm thick welded each other for making the structure of shed including fixing the Powder coated MS Sheet of 0.45 mm thick over the pipe for covering the shed with providing 1 No. Single leaf door of size 0.90 mtr. X 2.00 mtr and 1 No. Aluminium grill on front side of size 50x50 x5mm thick of size 2.00 mtr.x 0.60 mtr. Height. And 3 Nos. Ventilator for 0.90 mtr.x o.30 mtr on top including all necessary fixtures, the vertical square pipe is to be fixed in PCC 1:2:4 CM. | 1.000 | Each |
3 | Earthwork excavation in hard Murum for foundation including throwing the excavated stuff away from the monument. | 6.913 | Cum |
4 | Providing and laying plain cement concrete mixing with 20 mm size stone metal aggregate in 1:2:4 proportion for foundation base of RO Shed platform including compacting, curing etc, complete as directed. | 0.988 | Cum |
5 | Providing and Constructing UCR stone masonry wall in Cement mortar 1:4 using hard trap stones obtained from approved quarry, including racking out joints, curring etc complete. | 7.984 | Cum |
Purchase Access To Download Selected Documents
₹ 200